Business
Hunt Mining Metallurgical Test Results
LIBERTY LAKE, Wash., June 21, 2016 (GLOBE NEWSWIRE) -- Hunt Mining Corp. (“Hunt” or the “Corporation”) (TSX-V:HMX) is pleased to announce metallurgical test res

About this update from Patagonia Gold Corp
[{"type":"text","content":"LIBERTY LAKE, Wash., June 21, 2016 (GLOBE NEWSWIRE) -- Hunt Mining Corp. (“Hunt” or the “Corporation”) (TSX-V:HMX) is pleased to announce metallurgical test results from the La Josefina gold and silver project (“La Josefina Project”) located in the Santa Cruz Province, Argentina. The La Josefina Project lies 110 kilometers from the Martha Mill, which was acquired by the Corporation on May 12, 2016. The metallurgical testing focused on the Ailin vein at the La Josefina Project, with samples being sent to McClelland Labs in Reno, Nevada, as previously announced on March 30, 2016. The lab tested for whole ore cyanidation and flotation concentration. Ailin ore, ground to 80% passing 100 mesh (150 micron), yielded recoveries of 96.0% Au and 72.3% Ag for 96 hours of whole ore cyanidation. Flotation concentration tests of Ailin ore ground to 80% passing 200 mesh (75 micron) resulted in recoveries of 88.6% Au and 65.6% Ag. The Bond's Work Index, determined at 100 mesh grind size on the Ailin vein ore was 12.81, which indicates that the ore is of medium grindability. Bond's Work Index was established by Resource Development Inc. located in Wheat Ridge, Colorado. President and Chief Executive Officer Tim Hunt states; “Flotation test results for our La Josefina Ailin ore are in the range anticipated beforehand, and applied in internal financial modeling show that the ore can be processed in our recently purchased Martha Mill without significant modifications. Cyanidation recoveries were exceeding our expectations and we are now considering the incorporation of cyanidation into our processing stream. The Martha Mill is only 110km by road from our La Josefina project so Ailin ore can easily be hauled to the mill on public roads.” The Martha Mill contains a 240 tonne per day (“TPD”) flotation plant which includes a crushing circuit. The Martha Mine has additional milling capacity for up to 480 TPD. Additional information including photos of the Martha Mine are available on the Corporation’s website at: www.huntmining.com. Klaus Triebel, Hunt Mining's Director of Project Development, is a Qualified Person under NI 43-101 who has approved the technical aspects of this news release. About Hunt Mining Hunt Mining Corp. has continued to develop its properties as an active and aggressive explorer in Santa Cruz since 2006. During that time, Hunt's w...