Business

Winston Tailings Project: Sample Collection

Panther Metals PLC has successfully completed the vibracore sample collection phase for its Winston Tailings Project, with tailings thickness exceeding expectations, reaching a maximum of 16.8m and averaging 8.7m. A total of 109 core samples were retrieved from 109 locations across the frozen tailings pond, with duplicate and restarted vertical profiles collected at select sites. This sampling is crucial for quantifying gold, gallium, silver, zinc, copper, indium, and cobalt, and will support the Mineral Resource estimate, a key step towards a cashflow proposition and the Recovery Permit application. Engagement with First Nation stakeholders has also occurred, and sample analysis is underway at ALS Laboratories. Disclaimer*

articlePanther Metals PlcMarch 16, 20265/company/panther-metals-plc/news/winston-tailings-project-sample-collection
Winston Tailings Project: Sample Collection

About this update from Panther Metals Plc

[{"type":"text","content":"\n\nNOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION\nTHIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF REGULATION 2014/596/EU WHICH IS PART OF DOMESTIC UK LAW PURSUANT TO THE MARKET ABUSE (AMENDMENT) (EU EXIT) REGULATIONS (SI 2019/310) (\"UK MAR\"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION (AS DEFINED IN UK MAR) IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.\n\n\n\n\nFOR IMMEDIATE RELEASE\n\n\n\n\n\n\n\nPANTHER METALS PLC\n(\"Panther\" or the \"Company\")\n(Incorporated in the Isle of Man with company number 009753V)\n \n16 March 2026\nWinston Tailings Project: Sample Collection Complete\n \nPanther Metals Plc (LSE: PALM), the exploration company focused on mineral projects in Canada, is pleased to report the vibracore sample collection work phase at the Winston Tailings Project has successfully completed.\nThe completed ice-barge mounted vibracore sampling is the first of a series of ongoing workstreams progressing to quantify, evaluate and permit the contained high-grade gold (Au), gallium (Ga), silver (Ag), zinc (Zn), copper (Cu), indium (In) and cobalt (Co) and other recoverable minerals located within the historic Winston Lake Mine tailings storage facility (\"TSF\") near Schrieber, Ontario, Canada.\nKey points:\n·    Tailings vibracore sample collection phase of the Mineral Resource estimate (\"MRE\") programme has successfully completed with no incidents or accidents.\n \n·    Thickness of the tailings exceeded expectation reaching a maximum vertical thickness of tailings (below ice and water) of 16.8m and with an average vertical thickness of 8.7m.\n \n·    Laterally and vertically representative tailings core samples successfully retrieved from across the extent of the frozen tailing pond, with representative HQ core (63.5mm) diameter cylinders of tailings material through the vertical profile of the tailings, from 109 locations at regular grid spacings across the TSF (see Figure 1 and Figure 2).\n \n·    Vibracore sampling grid comprises a total of...

More updates from Panther Metals Plc