Business

Pacifica Silver to Launch 12,000 m Phase II Drill Program at the Claudia Silver-Gold Project

Vancouver, British Columbia--(Newsfile Corp. - January 12, 2026) - Pacifica Silver Corp. (CSE: PSIL) (OTCQB: PAGFF) ("Pacifica" or the "Company") is pleased to provide an exploration update at the Company's wholly owned Claudia Silver-Gold Project ("Project") located in Durango, Mexico. The Company completed its Phase I drill program at the end of December 2025 with assay results pending release for 19 holes. A Phase II drill program will commence on January 15 which will include approximately..

articlePacifica Silver Corp.January 12, 202612/company/pacifica-silver-corp/news/pacifica-silver-to-launch-12000-m-phase-ii-drill-program-at-the-claudia-silver-gold-project
Pacifica Silver to Launch 12,000 m Phase II Drill Program at the Claudia Silver-Gold Project

About this update from Pacifica Silver Corp.

[{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - January 12, 2026) - Pacifica Silver Corp. (CSE: PSIL) (OTCQB: PAGFF) ("Pacifica" or the "Company") is pleased to provide an exploration update at the Company's wholly owned Claudia Silver-Gold Project ("Project") located in Durango, Mexico. The Company completed its Phase I drill program at the end of December 2025 with assay results pending release for 19 holes. A Phase II drill program will commence on January 15 which will include approximately 12,000 m of diamond drilling to follow up on high-grade results encountered in the Phase I program and to test high-priority targets in the southern portion of the property. The Company is also continuing district-scale exploration work which commenced in September 2025 and is pleased to provide an update on work accomplished to date.","length":869,"tagName":"p"},{"type":"text","content":""We are excited to kick off our Phase II drill campaign following strong initial drill results which have reinforced our confidence in the scale and quality of the vein systems at our Claudia Project," stated Todd Anthony, CEO of Pacifica Silver Corp. "With a substantial number of assays still pending, there is considerable upside yet to be revealed. Our Phase II program is designed to systematically step out on high-grade intercepts and to expand our understanding of the broader district-scale potential. Given the extensive vein systems and numerous high-priority targets at the Claudia Project, we plan to maintain continuous drilling throughout 2026 and are optimistic about the potential to increase our program by more than 25,000 metres as results warrant."","length":789,"tagName":"p"},{"type":"text","content":"Phase I Drill Program Completed - 19 Assays Pending ","length":51,"tagName":"p"},{"type":"text","content":"The Company completed its Phase I drill program on December 28th with a total of 7,992 metres drilled in 29 holes. Assay results for the first 10 holes were announced on December 15, 2025, including:","length":199,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Hole 25CLAU037D, which intersected 10.5 m grading 2.29 g/t Au and 51 g/t Ag from 113.0 m downhole, including 6.55 m of 3.38 g/t Au and 74 g/t Ag, and a higher-grade interval of 0.60 m grading 20.3 g/t Au an...

More updates from Pacifica Silver Corp.

The CompanyCompanyClaudia Silver-Gold ProjectPacifica SilverAuPacifica