Business
Miranda and Prism Announce Drill Program Testing Epithermal System at Cerro Oro Project, Colombia
Miranda and Prism Announce Drill Program Testing Epithermal System at Cerro Oro P...

About this update from Outcrop Silver & Gold Corporation
[{"type":"text","content":"Miranda and Prism Announce Drill Program Testing Epithermal System at Cerro Oro Project, Colombia \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Miranda and Prism Announce Drill Program Testing Epithermal System at Cerro Oro Project, Colombia\n Vancouver, BC (FSCwire) - Miranda Gold Corp. (\"Miranda\") (TSX-V: MAD) and Prism Resources Inc. (“Prism”) (NEX: PRS.H) are pleased to announce a planned drill program for the Cerro Oro Project in Colombia.  Prism is the funding partner and Miranda is the operator in joint venture.  Four to five angle holes totaling 1,000 m are planned. Drilling is anticipated to begin before the end of May 2016.\n\n \n\nMiranda has completed geologic mapping and extensive 2-meter channel sampling. Approximately 416 channel samples have been taken. Twenty percent of those samples assay greater than 0.2 g Au/t.  Multiple sub-parallel one to two meter width veins are identified within an area of alteration greater than 1 sq km. &...