Business
Orla Mining Announces Positive Initial Metallurgical Results on Camino Rojo Sulphide Project
Orla Mining Announces Positive Initial Metallurgical Results on Camino Rojo Sulphide Proj...

About this update from Orla Mining Ltd.
[{"type":"text","content":"\n \n \n \n Orla Mining Announces Positive Initial Metallurgical Results on Camino Rojo Sulphide Project\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE; BORDER-TOP:1pt black; BORDER-RIGHT:1pt black; BORDER-BOTTOM:1pt black; BORDER-LEFT:1pt black\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n Potential for Standalone Phased Processing Option\n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n May 8, 2022\n \n \n /CNW/ -\n \n Orla Mining Ltd.\n \n (TSX: OLA) (NYSE: ORLA) (\"Orla\" or the \"Company\") is pleased to provide a summary of Phase 1 metallurgical test results on its Camino Rojo sulphide deposit (the \"Sulphide Project\" or \"Camino Rojo Sulphides\"), located in\n \n Zacatecas, Mexico\n \n .\n \n \n The Phase 1 metallurgical program has greatly increased Orla's understanding of metallurgical characteristics of Camino Rojo Sulphides, and appears to open up multiple processing options for the Camino Rojo Sulphides relative to what was suggested by previous work. The Phase 1 metallurgical program included tests on grinding characteristics, amenability to cyanidation, selective flotation, and pressure oxidation. In addition to the Phase 1 tests, a geometallurgical model was developed using new and historical metallurgical test results. Geometallurgical modelling integrates geological, geochemical, mineralogical, and recovery data to characterize zones of metallurgical response. It supports mine planning, flowsheet design, and connects mine and process planning as part of the optimization of mine-to-mill production and economic analysis. Highlights of Phase 1 metallurgical program include the following:\n \n \n \n The geometallurgical model recognized five, spatially distinct, physically continuous geometallurgical zones within the 7.3-million-ounce sulphide...