Business
Northern Lights Resources Receives Permit to Drill Tin Cup Prospect at Secret Pass
VANCOUVER, BC / ACCESSWIRE / June 8, 2021 / Northern Lights Resources Corp. ("Northern Lights" or the "Company") (CSE:NLR)(OTCQB:NLRCF) is pleased to announce t

About this update from Northern Lights Resources Corp
[{"type":"text","content":" VANCOUVER, BC / ACCESSWIRE / June 8, 2021 / Northern Lights Resources Corp. (\"Northern Lights\" or the \"Company\") (CSE:NLR)(OTCQB:NLRCF) is pleased to announce that it has received approval from the Arizona State Land Department ( the \"ASLD\") to commence drilling at the Tin Cup Prospect at the Company's Secret Pass Gold Project (\"Secret Pass\") in Mohave County, Arizona. Northern Lights began drilling at Secret Pass on April 15 and is now completing the 4rth drill hole (total approximately 600 metres) out of the total 22 permitted drill holes located on mineral claims registered with the US Bureau of Land Management (the \"BLM\"). The prospects drilled included Fiery Squid, Nine Second Shaft and Fluorspar Ridge locations. (See Figure 1) All drill core has been split and sent to Skyline Laboratories in Tucson, assays are pending. CEO, Jason Bahnsen, commented \"Historic RC drilling at Tin Cup in the 1980s intersected steeply angled veins with grades up to 40 grams per tonne gold. We are excited to begin drilling at Tin Cup where we plan to confirm the previous high-grade RC results with large diameter HQ diamond core drilling and test the system to a depth of approximately 350 metres, well below the maximum historic drilling depth of 180 metres. We are completing drilling at the Fluorspar Ridge Prospect and will immediately move the drill to the Tin Cup Prospect to begin the planned 7-hole program.\" Seven exploration drill holes have been approved at the Tin Cup Prospect (total 1,350 metres planned) The initial drill program at Tin Cup is planned to confirm high-grade mineralization from historic drilling and to test the down plunge extension of the mineralization to a depth of approximately 350 metres below the surface. Table 1 - Planned Drill Holes at Tin Cup Prospect Hole No. Location Azimuth (o) Dip (o) Length (m) TC01 Tin Cup 310 -50 250 TC02 Tin Cup 220 -45 175 TC03 Tin Cup 220 -55 225 TC04 Tin Cup 220 -65 400 TC05 Tin Cup 040 -60 100 TC06 - F2 Tin Cup 180 -45 100 TC07 - F2 Tin Cup 100 Total 1,350 Tin Cup Zone Records show that there was an historic small scale open pit and underground mine located at Tin Cup. The mine reportedly produced several hundred tons of mineralized materialgrading 15 g/t to 31 g/t of gold. Historic workings, from approximately 1918 to the early 1930's, inc...