Business

North Bay Resources Announces Assay of 6.62 Ounces per Ton Gold, Fran Gold Project, British Columbia

North Bay Resources Announces Assay of 6.62 Ounces per Ton Gold, Fran Gold Project, British Columbia.

articleNorth Bay Resources, Inc.November 4, 20255/company/north-bay-resources/news/north-bay-resources-announces-assay-of-662-ounces-per-ton-gold-fran-gold-project-british-columbia
North Bay Resources Announces Assay of 6.62 Ounces per Ton Gold, Fran Gold Project, British Columbia

About this update from North Bay Resources, Inc.

[{"type":"text","content":"\r\n\r\n \r\n \r\n North Bay Resources Announces Assay of 6.62 Ounces per Ton Gold, Fran Gold Project, British Columbia\r\n \r\n \r\n\r\n\r\nNorth Bay Resources Announces Assay of 6.62 Ounces per Ton Gold, Fran Gold Project, British Columbia\r\n\r\n\r\n\r\n\r\n\r\nBISHOP, Calif., Nov. 04, 2025 (GLOBE NEWSWIRE) -- North Bay Resources, Inc. (the “Company” or “North Bay”) (OTC: NBRI) is pleased to announce a weighted average of 3.38 ounces per ton gold from the maiden ore shipment at Fran Gold Project, British Columbia. The result now includes an assay of 6.62 ounces per ton gold. As previously announced (see Press Release October 27, 2025) this sample (25FRTB-5) reached the limit of detection and was re-assayed using ALS Global method Au-GRA21. Four samples of ~5lbs each were taken from alternating supersacks, as part of a test shipment of ore from the near surface massive sulphide zone: \r\n \r\n Sample number\r\n Weight lbs.\r\n Weight kg.\r\n Au Ounces per Ton\r\n Au Grams per Tonne\r\n \r\n \r\n 25FRTB-1\r\n 4.4\r\n 2.0\r\n 0.41\r\n 14.0\r\n \r\n \r\n 25FRTB-4\r\n 7.8\r\n 3.5\r\n 2.64\r\n 90.5\r\n \r\n \r\n 25FRTB-5\r\n 7.5\r\n 3.4\r\n 6.62\r\n 227\r\n \r\n \r\n 25FRTB-6\r\n 5.0\r\n 2.3\r\n 2.30\r\n 78.7\r\n \r\n Initial assays were completed by ALS Global, North Vancouver, BC using fire assay method Au-AA25 – Multi-element analysis, inclusive of Ag and Cu assays, are pending. https://ml.globenewswire.com/Resource/Download/8bb6eb94-40fb-45ff-8363-a32e3914fa82/gold-ore-closeup.jpg Picture 1. High Grade Ore at Fran Gold Project, British Columbia Bishop Gold Mill Delivery of the gold ore shipment by tractor trailer of 10 super sacks (22,597 lbs. net dry weight), to the Company’s 96 ton per day Bishop Gold Mill is expected at noon today. The ore will be processed to produce a concentrate for delivery to the Company’s refinery partner Reno, Nevada. Fran Gold Project The Fran Property is underlain by Takla Group sedimentary and volcaniclastic rocks intruded by dykes and small stocks of monzonite, monzodiorite and diorite. Previous work, including 55,000 ft. (18,000m) of diamond drilling, has outlined gold-bearing structures featuring broad zones of gold mineralization. In addition to the high grade massive sulphides zone now under development. Fran Gold contains an (non-independent) e...

More updates from North Bay Resources, Inc.