Business

North Arrow Minerals Reports Microdiamond Results From Kimberlite ML8 Mel Diamond Project, Nunavut

VANCOUVER, British Columbia, Nov. 13, 2018 (GLOBE NEWSWIRE) -- North Arrow Minerals Inc. (TSXV-NAR) is pleased to provide an update on the Company’s 100% owned

articleNorth Arrow Minerals Inc.November 13, 20184/company/north-arrow-minerals-inc/news/north-arrow-minerals-reports-microdiamond-results-from-kimberlite-ml8-mel-diamond-project-nunavut
North Arrow Minerals Reports Microdiamond Results From Kimberlite ML8 Mel Diamond Project, Nunavut

About this update from North Arrow Minerals Inc.

[{"type":"text","content":" VANCOUVER, British Columbia, Nov. 13, 2018 (GLOBE NEWSWIRE) -- North Arrow Minerals Inc. (TSXV-NAR) is pleased to provide an update on the Company’s 100% owned Mel Diamond Project, Nunavut, including initial microdiamond recoveries from surface sampling of kimberlite ML8. The Mel Project is well located, approximately 20 km from tidewater with exploration work conducted from a camp established approximately 140 km south and 210 km northeast of the Hamlets of Hall Beach and Naujaat, respectively. Highlights of this update include: Caustic fusion processing of 129 kg from ML8 has returned 33 diamonds greater than the 0.106 mm sieve size including one diamond greater than the 0.85 mm sieve size; An additional 78 kg of ML8 has been processed with final diamond recoveries underway; Drill core from kimberlites ML8 and ML345 is now in Vancouver and undergoing detailed petrographic logging as well as kimberlite indicator mineral (KIM) and microdiamond sampling; Processing has started on 447 till samples collected during the summer field program. KIM recoveries will be used to better define existing and new targets within the 56,075 ha project area. President and CEO, Ken Armstrong commented “Microdiamond recoveries from kimberlite ML8 continue to be encouraging, with diamonds recovered across a range of sizes. We look forward to receipt of further sample results from ML8 and ML345, as well as 447 till samples collected as part of an extensive sampling program completed during the 2018 summer program. KIM results from the till and kimberlite samples will be very important for defining priority target areas within the project. The Mel exploration camp remains in place to support renewed exploration drilling of new and established targets in 2019.” Caustic fusion results for a 129 kg composite sample of kimberlite ML8 are summarized in the following table along with earlier reported microdiamond results from 2017:     Number of Diamonds per Sieve Size (mm Square Mesh Sieve) Sample Year SampleWeightDry Kg +0.106-0.150 +0.150-0.212 +0.212-0.300 +0.300-0.425 +0.425-0.600 +0.600-0.850 +0.850-1.18 TotalStones 2018 129.0 7 9 8 6 1 1 1 33 2017* 62.1 9 3 5 4 0 1 1 23 *Previously reported in North Arrow news release date October 17, 2017 The majority of recovered diamonds, including the three largest stones, are white to off-white in col...

More updates from North Arrow Minerals Inc.