Business
Norsemont Drills 94 meters at 1.26 g/t Au and 109 meters at 1.09 g/t Au Both Holes Starting at Surface
VANCOUVER, BC / ACCESS Newswire / February 24, 2026 / Norsemont Mining Inc. (CSE:NOM)(OTCID:NRRSF)(FWB:LXZ1) ("Norsemont" or the "Company") is pleased to announce precious-metal assay results for three (3) of the Phase 3 drill holes at it's the 100%-owned ...
About this update from Norsemont Mining Inc.
[{"type":"text","content":"VANCOUVER, BC / ACCESS Newswire / February 24, 2026 / Norsemont Mining Inc. (CSE:NOM)(OTCID:NRRSF)(FWB:LXZ1) ("Norsemont" or the "Company") is pleased to announce precious-metal assay results for three (3) of the Phase 3 drill holes at it's the 100%-owned Choquelimpie high-sulfidation gold-silver-copper project in northern Chile. Seven (7) holes of the Phase 3 drill program have been completed, for a total of 1,650 meters. Norsemont is planning to resume drilling operations in April 2026.","length":517,"tagName":"p"},{"type":"text","content":"The drilling has provided important data for the extension of higher-grade zones, to depth. Drill samples for the complete drill program have been submitted to the laboratory. Results have been received for three (3) holes, although some intervals with initial "over-limit" results remain to be re-assayed. Partial results also have been received for additional holes. The balance of assays are expected to be received later this quarter.","length":448,"tagName":"p"},{"type":"text","content":"Highlights","length":10,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"MV25-DD01 intersected 109 meters at 1.09 g/t, including 45 meters at 1.21 g/t Au.","length":81,"tagName":"p"}]},{"val":[{"type":"text","content":"MV25-DD02 intersected 94 meters at 1.26 g/t Au, including 31 meters at 1.79 g/t Au.","length":83,"tagName":"p"}]},{"val":[{"type":"text","content":"MV25-DD03 intersected 33 meters at 0.87 g/t Au.","length":47,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":211,"olType":false},{"type":"text","content":"Management Comments","length":19,"tagName":"p"},{"type":"text","content":"Norsemont CEO Marc Levy commented:","length":34,"tagName":"p"},{"type":"text","content":""We are pleased with the positive gold results from the first three holes of the 2025 Phase 3 drill program. These long intercepts are above the current sulfide resource grade, highlighting the potential to upgrade the resource. We are also encouraged by the geological team's growing understanding of the controls on higher-grade mineralization. The presence of anomalous base-metal mineralization is particularly intriguing, and we look forward to receiving the re-assay results and integrating those data into the broader Choquelimpe geological model. These ...