Business

Noram Receives Results for CVZ-75 & 76: High-Grade Intercepts of 150 Ft (45.7 M) Averaging 962 PPM, & 100 Ft (30.5 M) Averaging 1163 PPM Respectively

VANCOUVER, BC / ACCESSWIRE / June 2, 2022 / Sandy MacDougall, CEO of Noram Lithium Corp. (" ...

articleNoram Lithium CorpJune 2, 20224/company/noram-lithium-corp/news/noram-receives-results-for-cvz-75-and-76-high-grade-intercepts-of-150-ft-457-m-averaging-962-ppm-and-100-ft-305-m-averaging-1163-ppm-respectively
Noram Receives Results for CVZ-75 & 76: High-Grade Intercepts of 150 Ft (45.7 M) Averaging 962 PPM, & 100 Ft (30.5 M) Averaging 1163 PPM Respectively

About this update from Noram Lithium Corp

[{"type":"text","content":"Noram Receives Results for CVZ-75 & 76: High-Grade Intercepts of 150 Ft (45.7 M) Averaging 962 PPM, & 100 Ft (30.5 M) Averaging 1163 PPM RespectivelyVANCOUVER, BC / ACCESSWIRE / June 2, 2022 / Sandy MacDougall, CEO of Noram Lithium Corp. (\"Noram\" or the \"Company\") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is pleased to announce the successful completion of CVZ-75 (PH-01) and CVZ-76 (PH-02) and release of the final assay results. The Company completed core hole CVZ-75 at a depth of 326 feet (99.4 m). Sampling for assays began at 46 ft (14.0 m) and continued to the bottom of the hole, an interval thickness of 150 ft (45.7 m) was intersected from 46 ft (14.0 m) to 196 ft (59.7 m). The hole ended in mineralization and the weighted average lithium values present are summarized below. The Company completed core hole CVZ-76 at a depth of 338 feet (103.0 m). Sampling for assays began at 26 ft (7.9 m) and continued to the bottom of the hole, an interval thickness of 100 ft (30.5 m) was intersected from 26 ft (7.9 m) to 126 ft (38.4 m). The hole ended in mineralization and the weighted average lithium values present are summarized below.Figure 1 - Location of all past drill holes (Phase I to Phase V) previously completed in addition to the 12 proposed holes for Phase V1. Phase VI holes are indicated in purple.Figure 2 - Comparative stratigraphy and assay results for drill holes CVZ-76 and CVZ-75 as compared to CVZ-63 which was drilled as part of a prior program. The histogram on the sides of the holes are the composited lithium grades in ppm Li. The cross section has a 4X vertical exaggeration.\"Holes CVZ-75 and CVZ-76 were located near the northeast end of the Phase V and Phase VI drilling. This is an area where the sediments are thinner since we are getting close to the basin margin. However, the lithium grades continue to be high. These holes are expected to continue to upgrade portions of the Zeus resource from inferred to indicated in Noram's upcoming PFS.\" comments Brad Peek, VP of Exploration and geologist on all six phases of Noram's Clayton Valley exploration drilling.Hole IDSample No.From (ft)To (ft)From (m)To (m)Li (ppm)CVZ-751748394465614.017.11690CVZ-751748395566617.120.1890CVZ-751748396667620.123.2840CVZ-751748397768623.226.2910CVZ-751748398869626.229.31420CVZ-7517483999610629.332.31160CVZ-75174840010611632.335.41010CVZ-75...

More updates from Noram Lithium Corp