Business
Noram Receives Permits for Zeus Fall Phase V Drill Campaign and Commences Drilling
VANCOUVER, BC / ACCESSWIRE / November 10, 2020 / Noram Ventures Inc. ("Noram") (TSXV:NRM)(Fr...

About this update from Noram Lithium Corp
[{"type":"text","content":"Noram Receives Permits for Zeus Fall Phase V Drill Campaign and Commences DrillingVANCOUVER, BC / ACCESSWIRE / November 10, 2020 / Noram Ventures Inc. (\"Noram\") (TSXV:NRM)(Frankfurt:N7R)(OTCQB:NRVTF) is pleased to announce the receipt of permits for Phase V drilling of the Zeus Lithium Project in Clayton Valley Nevada, following the successful Phase IV drill program that significantly increased the resource estimates. Phase IV drilling and earlier results were used for a new resource estimate: 124 million tonnes at 1136 ppm lithium as Indicated Resources, and 77 million tonnes lithium at 1045 ppm lithium as Inferred Resources, for a total of 201 million tonnes at 1101 ppm lithium (900 ppm Li cut-off: 1.18 million tonnes lithium carbonate equivalent - \"LCE\" ; see Noram Ventures press release of February 5, 2020).A CAT drill is onsite and currently operating. In the forthcoming days of the program, the Company intends to run with 2 drill teams, drilling 24 hours a day, until the program has been completed. All 12 holes will be drilled to an approximate depth of 120m (393ft). The lithium claystone is known to extend to 120 m (393 ft) depth across much of the property. This phase of drilling is designed to expand the existing resource and extend the mineralization to the south and east of the current resource area, which will significantly increase the area of exploration on the Property. The BLM has initially approved 7 holes, which will keep the amount of disturbed acreage under 5 acres. The required reclamation to expand this to 12 is almost completed, and the BLM will allow the expansion of the permitting to include the remaining 5 holes once finished.Figure 1. Zeus property map showing: a) location of current Indicated and Inferred resources at >900 ppm Li cut-off; b) West-East cross-section shown in figure 2; and c) location of proposed drill holes for Fall 2020 campaignFigure 2. West-East cross-section across known mineralization within Esmeralda Formation lithium claystones, categorized by grade. Note that the terrain rises to the East, and the grade and thickness are highest in this direction.Geologists for both Noram and Cypress believe that the deposit is part of the Clayton Valley playa lakebed that has been uplifted to surface by faulting. With that in mind, the deposit is considered to be a blanket- like layer t...