Business

Noram Receives Assay Results for Lower Portion of CVZ-62: High of 1900ppm & Average of 1113ppm LI Over 290ft (88m)

VANCOUVER, BC / ACCESSWIRE / January 28, 2021 / Noram Ventures Inc. ("Noram" or the "Company...

articleNoram Lithium CorpJanuary 28, 20214/company/noram-lithium-corp/news/noram-receives-assay-results-for-lower-portion-of-cvz-62-high-of-1900ppm-and-average-of-1113ppm-li-over-290ft-88m
Noram Receives Assay Results for Lower Portion of CVZ-62: High of 1900ppm & Average of 1113ppm LI Over 290ft (88m)

About this update from Noram Lithium Corp

[{"type":"text","content":"Noram Receives Assay Results for Lower Portion of CVZ-62: High of 1900ppm & Average of 1113ppm LI Over 290ft (88m)VANCOUVER, BC / ACCESSWIRE / January 28, 2021 / Noram Ventures Inc. (\"Noram\" or the \"Company\") (TSXV:NRM)(FSE:N7R)(OTCQB:NRVTF) is pleased to announce that the Company has received the second half of the results for CVZ-62. Noram had previously received the assay results for the upper portion of drill hole CVZ-62. The 26 samples were rushed to ALS Global Laboratories of North Vancouver, B.C taken from the first 227 ft (69 m) drilled. From 137 ft (42 m) to 227 ft (69 m) (an intersection of 90 ft or 27 m), the samples contained an average of 1049 ppm lithium.With the receipt of the results from the lower portion of CVZ-62, Noram has been able to conclude that a total intersection of 290 ft (88M) was drilled with an average of 1113 ppm lithium.\"This is one of the longer intervals of claystones to date and will contribute significantly to the resource calculation. We are exceptionally pleased with these results\" commented Brad Peek, consulting geologist and Qualified Person for this and all 4 of the previous drilling phases of Noram's Zeus lithium property.This average is consistent with Noram's current resource estimate of 124 million tonnes at 1136 ppm lithium as Indicated Resource, and 77 million tonnes lithium at 1045 ppm lithium as Inferred Resource (900 ppm Li cut-off: 1.18 million tonnes lithium carbonate equivalent - \"LCE\", area shown in red below) after the completion of the prior 4 phases of drilling.The summary of assay results is as follows:Hole IDSample No.From (ft)To (ft)Depth to TopDepth to BaseRecvd Wt. (Kg)Li (ppm)CVZ-62171014413173.965.180.54630CVZ-62171014517275.188.232.2620CVZ-62171014627378.2311.281.62500CVZ-621710147374711.2814.332.38580CVZ-621710148475714.3317.372.66362CVZ-621710149576717.3720.422.06423CVZ-621710150677720.4223.472.92550CVZ-621710151778723.4726.522.98500CVZ-621710152879726.5229.572.94810CVZ-6217101539710729.5732.612.52640CVZ-62171015410711732.6135.662.94790CVZ-62171015511712735.6638.712.32570CVZ-62171015612713738.7141.763.02770CVZ-62171015713714741.7644.812.541210CVZ-62171015814715744.8147.853.02820CVZ-62171015915716747.8550.903.08930CVZ-62171016016717750.9053.952.64710CVZ-62171016217718753.9557.002.24930CVZ-62171016318719757.0060.053.46810CVZ-62171016419720760.0563.093.3419...

More updates from Noram Lithium Corp