Business

Noble Updates Current Drilling Progress on the Lucas Township Gold Project Results of Annual Meeting of Shareholders

(via TheNewswire) Toronto, Ontario / TheNewswire / March 01, 2018 - Noble Mineral Expl...

articleNoble Mineral Exploration Inc.March 1, 20185/company/noble-mineral-exploration-inc/news/noble-updates-current-drilling-progress-on-the-lucas-township-gold-project-results-of-annual-meeting-of-shareholders
Noble Updates Current Drilling Progress on the Lucas Township Gold Project Results of Annual Meeting of Shareholders

About this update from Noble Mineral Exploration Inc.

[{"type":"text","content":"Noble Updates Current Drilling Progress on the Lucas Township Gold Project Results of Annual Meeting of Shareholders(via TheNewswire)\n\n \nToronto, Ontario / TheNewswire / March 01, 2018 - Noble Mineral Exploration Inc. (\"Noble\" or the \"Company\") (TSX-V: NOB, FRANKFURT: NB7, OTC.PK: NLPXF) is pleased to provide updates on its Lucas Township Gold Project located near Timmins, Ontario, Canada, and to announce the results of the meeting of shareholders held on February 22, 2018.\n\n \n \nThe Lucas Township Gold Project:\n\n \n \nFurther to the news release issued on February 12, 2018, Noble is pleased to announce that the exploration team currently drilling on the Lucas Township Gold Project, Timmins, Ontario, Canada has located a number of the Historical Mineralized Drill Collars (Table-1 & Figure-1). With this discovery, Noble is highly confident that its current drilling is being conducted at the right location.\n\n \n \nThe current drill program is designed to test Gold Mineralization over 700m strike length of the drill indicated historical gold mineralized structures, which lies within a 1700m EM anomalous trend identified from the recently completed Airborne Geophysical EM and Differential Mag Survey. The historical drill results are not compliant with the requirements of National Instrument 43-101. \n\n \n \nPhase 1 of the 2018 drilling campaign anticipates drilling up to 14 NQ size diamond drill holes for approximately 3000m. Six (6) drill holes totalling approximately 1420m have been completed to date and 722 samples, in 21 batches have been submitted to Actlabs in Timmins, Ontario for Gold (Au) and 32 elements ICP analysis. Samples are initially analysed for gold by Fire Assay with an Atomic Absorption (AA) finish (1A2 & 1E3 analytical package), and samples assaying above 3g/t Au, will be further analysed by Fire Assay with a Gravimetric Finish (1A3 Analytical Package). Sample assaying above 10g/t Au will be analysed by Fire Assay-Metallic Screen Analysis (1A4-500 Analytical Package). All assay results are pending as of the time of this news release.\n\n \n \nThe objective of this drill campaign is to confirm the historical drilling results dating back to the 1960-1980's, as reported by Canico, McIntyre Porcupine Mines Ltd, Abitibi Price Resources and Lucas Gold Resources. Recently re-compiled drill hole dat...

More updates from Noble Mineral Exploration Inc.