Business
Nine Mile Metals Announces XRF Results up to 18.38% Combined (Pb-Zn) on Holes CL22-08 & CL22-11 on Initial California Lake VMS Drill Program
VANCOUVER, British Columbia, Dec. 06, 2022 (GLOBE NEWSWIRE) -- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleas

About this update from Nine Mile Metals Ltd.
[{"type":"text","content":" VANCOUVER, British Columbia, Dec. 06, 2022 (GLOBE NEWSWIRE) -- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”) is pleased to announce the XRF results for VMS target Holes CL2208 and CL2211 at its initial Phase 1 drill program at its California Lake VMS Project in the world-famous Bathurst Mining Camp, New Brunswick (“BMC”). Highlights: VMS Target Hole CL2211 was a step out hole collared approximately 20 meters north of discovery hole CL2206 and drilled to a depth of 80 meters intersecting (4) zones of massive VMS mineralization between 51.10 and 62.00 meters (10.90m.) Sample # From (m) To (m) Width (m) Cu % Pb (%) Zn (%) (Pb + Zn) % Ag (g/t) Au (g/t) 226097 51.10 51.23 0.13 .02 1.62 5.28 6.90 TBD TBD 226098 51.23 51.73 0.50 .02 9.34 1.00 10.34 TBD TBD 226099 51.73 53.00 1.27 .07 0.95 6.70 7.65 TBD TBD 226101 54.04 55.04 1.00 .17 3.00 11.77 14.77 TBD TBD 226102 55.04 56.00 0.96 .31 2.83 11.45 14.28 TBD TBD 226107 59.63 60.20 0.57 .10 1.44 9.61 11.05 TBD TBD 226110 61.6 62.00 0.40 .38 0.30 2.90 3.58 TBD TBD VMS Target Hole CL2208 was collared near hole CL2206 and drilled at an azimuth of 312 degrees to a depth of 89 meters intersecting visible massive VMS mineralization between 67.33 and 70.50 meters (3.17m). Sample # From (m) To (m) Width (m) Cu (%) Pb (%) Zn (%) (Pb + Zn) % Ag (g/t) Au (g/t) 226070 67.33 68.33 1.00 .05 0.81 3.85 4.66 TBD TBD 226071 68.33 69.33 1.00 .17 3.26 15.12 18.38 TBD TBD 226072 69.33 70.50 1.17 .20 3.33 10.36 13.69 TBD TBD VMS mineralization in both drill holes was again dominated by Zn mineralization, with individual sample sections up to 15.12 % Zn. Pb mineralization was much more discreet. Both drill holes demonstrate that the mineralized zone is open in both directions along strike and depth. Samples of the VMS mineralization and adjacent rock have been shipped to the ALS Global Labs (“ALS”) for Certification. Note: Due to time constraints between the California Lake drill program and the initiation of the Nine Mile Brook VMS drill program, XRF analysis was only conducted on the zones of visible VMS mineralization. The complete mineralized zone has been sent to ALS for analysis and we will announce those complete results once received. All holes have been logged, photographed, measured, and cut. Holes 8-9-10-11-12-13 are currently in the XRF process and we look...