Business
Nine Mile Metals Announces Completion of DDH WD-25-02B and Continues to Confirm (2) Zones of Copper Rich VMS with 66 Meters of Mineralization at the Wedge Project
Toronto, Ontario--(Newsfile Corp. - December 22, 2025) - NINE MILE METALS LTD. (CSE: NINE) (OTC Pink: VMSXF) (FSE: KQ9) (the "Company" or "Nine Mile") is pleased to announce that the 3rd drill hole in its Wedge Western Extension Drill Program (DDH-WD-25-02B) has been completed.DDH WD-25-02B was collared approximately 60 meters northwest of WD-25-01 and drilled at an azimuth of 325 degrees and a dip of -50 degrees to a final depth of 122 meters further increasing the mineralized footprint of the.
About this update from Nine Mile Metals Ltd.
[{"type":"text","content":"Toronto, Ontario--(Newsfile Corp. - December 22, 2025) - NINE MILE METALS LTD. (CSE: NINE) (OTC Pink: VMSXF) (FSE: KQ9) (the "Company" or "Nine Mile") is pleased to announce that the 3rd drill hole in its Wedge Western Extension Drill Program (DDH-WD-25-02B) has been completed.","length":298,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"DDH WD-25-02B was collared approximately 60 meters northwest of WD-25-01 and drilled at an azimuth of 325 degrees and a dip of -50 degrees to a final depth of 122 meters further increasing the mineralized footprint of the target to the west (Figure 3).","length":253,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"DDH WD-25-02B was successful, with massive copper bearing sulphides (VMS - Cu-Pb-Zn-Ag-Au) found associated with the contact breccia at 56.4m depth with mineralization continuing to 122 meters.","length":193,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"The sulphide mineralization in the drill hole occurred in both sediments and volcanics, terminating in massive copper bearing sulphides (VMS - Cu-Pb-Zn-Ag-Au) with visible Chalcopyrite (CuFeS2) as seen in Figure 1.","length":214,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Downhole ground conditions in the fault zone (sand seams, gouge) led to the termination of the drill hole at 122 meters, as we were drilling through a massive copper zone (Figure 1).","length":182,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Most Sample sections between 53.0 and 122.0 meters were 3 meters in length, to provide the best overall data for the drill hole. Smaller sample widths were identified and cut where appropriate.","length":193,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"With massive mineralization present at the base of the drill hole, a new drill hole is being designed by the Technical Team, to be initiated from the other side of the fault zone, (New - to be permitted) in Phase 2 - 2026.","length":222,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":1257,"olType":false},{"type":"text","content":"FIGURE 1: Visible VMS Quality Mineralization, Massive Chalcopyrite (CuFeS2 ) - Samples cut for Lab Processing","length":109,"tagName":"p","attribs":{}},{"type":"image","alt":"","displaySize":"","h...