Business

Nine Mile Metals Announces Certified Drill Results on Holes CL22-12 & CL22-13 at the California Lake VMS Drill Program

VANCOUVER, British Columbia, Jan. 24, 2023 (GLOBE NEWSWIRE) -- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”), is plea

articleNine Mile Metals Ltd.January 24, 20233/company/nine-mile-metals-ltd/news/nine-mile-metals-announces-certified-drill-results-on-holes-cl22-12-and-cl22-13-at-the-california-lake-vms-drill-program
Nine Mile Metals Announces Certified Drill Results on Holes CL22-12 & CL22-13 at the California Lake VMS Drill Program

About this update from Nine Mile Metals Ltd.

[{"type":"text","content":" VANCOUVER, British Columbia, Jan. 24, 2023 (GLOBE NEWSWIRE) -- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”), is pleased to provide the Certified Assay results from ALS Global Labs for VMS target holes CL22-12 and CL22-13, at its initial Phase 1 drill program at its California Lake VMS Project in the world-famous Bathurst Mining Camp, New Brunswick (“BMC”). CL22-12 (Upper Zone) 34.15m to 35.30m (1.15m width) Certified Assays (0.20% Cu, 2.64% Pb, 8.07% Zn, 78 g/t Ag & 1.38 g/t Au) CL22-12 (Lower Zone) 51.04m to 52.60m (1.56m width) Certified Assays (0.09% Cu, 4.09% Pb, 12.59% Zn, 100. g/t Ag & 1.04 g/t Au) CL22-12 (Lower Zone) 52.04m to 52.60m (0.56m width) Certified Assays (0.11% Cu, 8.66% Pb, 22.3% Zn, 172 g/t Ag & 1.63 g/t Au) CL22-13 (Lower Zone) 51.23m to 53.23m (2.0m width) Certified Assays (0.17% Cu, 1.08% Pb, 5.64% Zn, 27.00 g/t Ag & 0.54 g/t Au) Highlights: VMS Target Hole CL22-12 was collared approximately 75 meters northwest of discovery hole CL22-06 and drilled towards its collar, dipping – 45 degrees to a depth of 62 meters intersecting (7) zones of massive VMS mineralization between 34.15 and 52.60 meters (18.45m.) HoleCL22-12 From (m) To (m) Width (m) Cu % Pb (%) Zn (%) (Pb + Zn) % Ag (g/t) Au (g/t) Overall 34.15 52.60 18.45 0.05 0.79 2.52 3.31 22.40 0.29                     Upper Zone 34.15 38.82 4.67 0.09 0.89 3.17 4.06 28.31 0.48                     LowerZone 48.80 54.60 5.80 0.06 1.93 5.75 7.68 49.84 0.53 Including 49.60 52.60 3.00 0.07 2.63 8.04 10.67 64.62 0.65 Including 52.04 52.60 0.56 0.11 8.66 22.3 30.96 172 1.63 VMS Target Hole CL22-13 was drilled from the same setup as CL22-12 along the same azimuth dipping – 55 degrees to a depth of 80 meters to test the depth extension of the mineralization in CL22-12. The hole intersected (3) zones of visible massive VMS mineralization between 49.23 and 59.00 meters (9.77m). HoleCL22-13 From (m) To (m) Width (m) Cu (%) Pb (%) Zn (%) (Pb + Zn) % Ag (g/t) Au (g/t) Overall 49.23 59.00 9.77 0.06 0.37 1.77 2.14 11.23 0.22                     Including 51.23 56.44 5.21 0.11 0.68 3.29 3.97 20.18 0.40 Including 51.23 54.48 3.25 0.15 0.87 4.38 5.25 24.90 0.50 Including ...

More updates from Nine Mile Metals Ltd.