Business

Wellgreen Platinum Commences Drill Program at the Wellgreen PGM-Nickel Project in the Yukon

Wellgreen Platinum Commences Drill Program at the Wellgreen PGM-Nickel Project in the Yuko...

articleNickel Creek Platinum Corp.July 11, 20163/company/nickel-creek-platinum-corp/news/wellgreen-platinum-commences-drill-program-at-the-wellgreen-pgm-nickel-project-in-the-yukon
Wellgreen Platinum Commences Drill Program at the Wellgreen PGM-Nickel Project in the Yukon

About this update from Nickel Creek Platinum Corp.

[{"type":"text","content":"\n\n\n\nWellgreen Platinum Commences Drill Program at the Wellgreen PGM-Nickel Project in the Yukon\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prnrbrb0{\nBORDER-RIGHT:black 0pt\n}\n.prnpl6{\nPADDING-LEFT:0.50em\n}\n.prnsbtb0{\nBORDER-BOTTOM:black 0pt\n}\n.prnsbl0{\nBORDER-LEFT:0pt\n}\n.prnsbr0{\nBORDER-RIGHT:0pt\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnsbb0{\nBORDER-BOTTOM:0pt\n}\n.prnsbt0{\nBORDER-TOP:0pt\n}\n.prnsblb0{\nBORDER-LEFT:black 0pt\n}\n.prnpr6{\nPADDING-RIGHT:0.50em\n}\n\n\n\n\n\n\nWellgreen Platinum Commences Drill Program at the Wellgreen PGM-Nickel Project in the Yukon\nCanada NewsWire\nVANCOUVER, July 11, 2016\n\n\n\n\n\n\nVANCOUVER, July 11, 2016 /CNW/ - Wellgreen Platinum Ltd. (TSX: WG; OTC-QX: WGPLF) (\"Wellgreen Platinum\" or the \"Company\") is pleased to announce commencement of a drill program and field work (the \"2016 Program\") at its 100% owned Wellgreen PGM-Nickel Project, located 317 km northwest of Whitehorse, Yukon.\n\nThe 2016 Program will consist of approximately 2,500 meters of drilling designed to (See Figure 1):\n\n\ntest resource expansion potential along the North Arm and the Middle Arm of the deposit, some of which was unclassified in the 2014 resource model and, therefore, categorized as waste in the Company's 2015 Wellgreen PEA1 (the \"2015 PEA\") \ntest for the potential conversion of a portion of Inferred Mineral Resources in the Central Zone into the Measured & Indicated categories and assess expansion of the starter pit detailed in the 2015 PEA; and \ncontinue testing of the continuity of higher grade intercepts in the Central Zone in the lower portion of the 2015 PEA Base Case pit.\n\nA successful limited borehole electromagnetic (\"EM\") survey conducted at the Wellgreen Project in the fourth quarter of 2015 identified previously drilled massive sulphides several tens of metres off-hole. Therefore, the Company plans to conduct additional borehole EM surveys in the 2016 Program to assist with targeting potential massive sulphides in the North Arm and Middle Arm. \n\nIn parallel with the 2016 Program and metallurgica...

More updates from Nickel Creek Platinum Corp.