Business

NG ENERGY COMPLETES DST-1 AT ARUCHARA-3 TESTING UP TO 16.7 MMSCFD

NG ENERGY COMPLETES DST-1 AT ARUCHARA-3 TESTING UP TO 16.7 MMSCFD Canada NewsWire ...

articleNg Energy International CorpSeptember 7, 20235/company/ng-energy-international-corp/news/ng-energy-completes-dst-1-at-aruchara-3-testing-up-to-167-mmscfd-1
NG ENERGY COMPLETES DST-1 AT ARUCHARA-3 TESTING UP TO 16.7 MMSCFD

About this update from Ng Energy International Corp

[{"type":"text","content":"\n \n \n \n NG ENERGY COMPLETES DST-1 AT ARUCHARA-3 TESTING UP TO 16.7 MMSCFD\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: TOP; TEXT-ALIGN: LEFT; BORDER-TOP:black 0.5pt solid; BORDER-RIGHT:black 0.5pt solid; BORDER-BOTTOM:black 0.5pt solid; BORDER-LEFT:black 0.5pt solid\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n 3 zones still to be tested with results to follow\n \n \n \n \n \n \n TORONTO\n \n \n ,\n \n \n Sept. 7, 2023\n \n \n /CNW/ -\n \n NG Energy International Corp.\n \n (\"\n \n NGE\n \n \" or the \"\n \n Company\n \n \") (TSXV: GASX) (OTCQX: GASXF) announces that, further to the Company's press release of\n \n September 5, 2023\n \n , it has completed DST-1 at Maria Conchita over a 22.5-hour period. The final test was conducted at a 1.25\" choke, testing 16 MMscf/d with 5 barrels of 43.7 API condensate recovered during the test. It was determined to not test the well at 2.0\" after sufficient information was gathered from the test.\n \n \n \n \n \n \n \n \n \n The complete results for DST-1 are as follows:\n \n \n \n \n \n \n \n \n Duration\n \n \n \n \n \n \n \n \n Choke Size\n \n \n \n \n \n \n \n \n Avg. Gas Flow\n \n Rate\n \n \n \n \n \n \n \n \n Water Flow Rate\n \n \n \n \n \n \n \n \n Avg. Tubing\n \n Pressure\n \n (THP)\n \n \n \n \n \n \n \n \n \n \n (hours)\n \n \n \n \n \n \n \n \n (inches)\n \n \n \n \n \n \n \n \n (MMscf/d)\n \n \n \n \n \n \n \n \n (bbl/d)\n \n \n \n \n \n \n \n \n (psig)\n \n \n \n \n \n \n \n \n \n 6\n \n \n \n \n \n \n 64/64\n \n \n \n \n \n \n 10.6\n \n \n \n \n \n \n 0\n \n \n \n \n \n \n 1,500\n \n \n \n \n \n \n \n \n 6\n \n \n \n \n \n \n 32/64\n \n \n \n \n \n \n 6.5\n \n \n \n \n \n \n 0\n \n \n \n \n \n \n 2,250\n \n \n \n \n \n \n \n \n 6\n \n \n \n \n \n \n 48/64\n \n \n \n \n \n \n 11.5\n \n \n \n \n \n \n 0\n \n \n \n \n \n \n 1,440\n \n \n \n \n \n \n \n \n 3\n \n \n \n \n \n \n 64/64\n \n \n \n \n \n \...

More updates from Ng Energy International Corp