Business
NG ENERGY ANNOUNCES SPUDDING OF ARUCHARA-4 AT MARIA CONCHITA AND PROVIDES SINU-9 PRODUCTION UPDATE
NG Energy International Corp. ("NGE" or the "Company") (TSXV: GASX) (OTCQX: GASXF) is pleased to announce the spudding of the Aruchara-4 well at Maria Conchita and that aggregate gross production from Sinu-9 has reached 22 MMcf/d. The Company is also pleased to provide an operational update for both Maria Conchita and Sinu-9.
About this update from Ng Energy International Corp
[{"type":"text","content":"CALGARY, AB, Aug. 14, 2025 /CNW/ - NG Energy International Corp. ("NGE" or the "Company") (TSXV: GASX) (OTCQX: GASXF) is pleased to announce the spudding of the Aruchara-4 well at Maria Conchita and that aggregate gross production from Sinu-9 has reached 22 MMcf/d. The Company is also pleased to provide an operational update for both Maria Conchita and Sinu-9.","length":388,"tagName":"p"},{"type":"image","alt":"Aruchara-4 Drilling Rig (CNW Group/NG Energy International Corp.)","displaySize":"","headline":null,"caption":"Aruchara-4 Drilling Rig (CNW Group/NG Energy International Corp.)","className":"","disableSlideshowImg":false,"size":{"original":{"width":400,"height":267,"url":"https://media.zenfs.com/en/cnwgroup.com/04e0107fc77cf17897d01096d7677f2a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/lFvetN1WSZpcZ5YPN8_s7g--/YXBwaWQ9aGlnaGxhbmRlcjt3PTcwNTtoPTQ3MTtjZj13ZWJw/https://media.zenfs.com/en/cnwgroup.com/04e0107fc77cf17897d01096d7677f2a","width":400,"height":267}},"href":"https://mma.prnewswire.com/media/2750165/NG_Energy_International_Corp__NG_ENERGY_ANNOUNCES_SPUDDING_OF_AR.html","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"Maria Conchita","length":14,"tagName":"p"},{"type":"text","content":"At Maria Conchita, the Company has commenced drilling of the Aruchara-4 well, which targets the Jimol formation and aims to develop the H1A and H1B accumulations while exploring the potential extension of reserves and resources in the H2 AA section and H3 and H4 fractures, as well as testing the limestone formation on top of the basement of the well. The Aruchara-4 well will be drilled to a total depth of 10,000 feet in four phases and upon successful completion, is expected to be tied in by the end of September 2025.","length":523,"tagName":"p"},{"type":"text","content":"Following the drilling of the Aruchara-4 well, the rig will immediately commence a workover and recompletion of the Aruchara-3 well to address a downhole mechanical obstruction, restoring it to full production capacity, before moving to commence drilling of the Aruchara-5 well.","length":278,"tagName":"p"},{"type":"text","content":"Sinu-9","length":6,"tagName":"p"},{"type":"text","content":"At Sinu-9, the Company is pleased to announce that production has increased to 22 MMcf/d while meeting the Unified Transportatio...