Business

Premium Commences Resource Expansion Through Drilling and Comprehensive Metallurgy Optimization at Selkirk

Toronto, Ontario--(Newsfile Corp. - May 15, 2025) - Premium Resources Ltd. (TSXV: PREM) (OTC Pin...

articleNexmetals Mining Corp.May 15, 20255/company/nexmetals-mining-corp-1/news/premium-commences-resource-expansion-through-drilling-and-comprehensive-metallurgy-optimization-at-selkirk
Premium Commences Resource Expansion Through Drilling and Comprehensive Metallurgy Optimization at Selkirk

About this update from Nexmetals Mining Corp.

[{"type":"text","content":"Premium Commences Resource Expansion Through Drilling and Comprehensive Metallurgy Optimization at SelkirkToronto, Ontario--(Newsfile Corp. - May 15, 2025) - Premium Resources Ltd. (TSXV: PREM) (OTC Pink: PRMLF) (\"PREM\" or the \"Company\") announces that a surface drilling program is underway and provides details of the work program at its past-producing copper-nickel-cobalt-platinum group elements (\"Cu-Ni-Co-PGE\") sulphide Selkirk mine (\"Selkirk Mine\") in Botswana. The drilling program is designed to demonstrate resource expansion and metallurgical flowsheet development. These initiatives are aimed at de-risking the project to support future development decisions. Highlights of Selkirk Work ProgramDrilling program initiated - A 12-hole drill program is underway at Selkirk (Figure 1), focused on twinning historical holes to validate legacy data, adding key data points to support a future resource model update, and resource expansion through continued resampling of historical core (See news release April 10, 2025). Continued resampling of historical core - In 2024, 17 historical drill holes were resampled to obtain complete PGE analysis (See press releases dated October 28, 2024, titled: \"Selkirk Deposit Provides Strong Historic Drill Core Results Including 186.25 Metres of 1.65% CuEq\"). An additional 34 historical holes have been identified for resampling. Metallurgical program ongoing - Aimed at refining orebody domains and developing a more comprehensive, de-risked metallurgical model reflected in an updated Mineral Resource Estimate (\"MRE\") and supporting studies.Morgan Lekstrom, CEO of Premium Resources states: \"Resampling the historical drill core has proven to be a cost-effective and impactful way to enhance our understanding of the Selkirk deposit. This phase of drilling will prove critical for resource reclassification as we rapidly advance toward restoring the project's legacy resource estimate. We remain focused on accelerating Selkirk and positioning it for near future development.\" The surface drilling program will collect fresh HQ-sized core to support metallurgical flowsheet, generate material for preliminary X-ray Transmission (\"XRT\") ore-sorting tests, and support the potential expansion and upgrade of the National Instrument 43-101 (\"NI 43-101\") compliant 44.2Mt Inferred MRE to the Indicated cate...

More updates from Nexmetals Mining Corp.