Business
NexMetals Hits Multiple 200-Meter Intercepts of High-Grade Mineralization at the Selkirk Project in Botswana
(TheNewswire) Vancouver, BC – TheNewswire - September 25, 2025 – Global Sto...

About this update from Nexmetals Mining Corp.
[{"type":"text","content":"NexMetals Hits Multiple 200-Meter Intercepts of High-Grade Mineralization at the Selkirk Project in Botswana\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n Vancouver, BC –\n \n TheNewswire -\n \n September 25,\n2025 – Global Stocks News – Sponsored content disseminated on\nbehalf of NexMetals Mining. On September 23, 2025, NexMetals Mining\n(TSXV: NEXM) (NASDAQ: NEXM) released\n \n assay results from two additional holes\n \n in the\n12-hole metallurgical drilling program at the\n \n Selkirk Mine in Botswana\n \n .\n \n\n Selkirk is a past-producing copper-nickel-cobalt-platinum group\nelements (Cu-Ni-Co-PGE) mine in Botswana.  It is situated 28\nkilometers south-east of the city of Francistown (pop. 103,000), and\n75 kilometers north of NexMetals’ Selebi Mines.\n \n\n\n\n\n\n\n Click Image To View Full Size\n \n\n\n Since completing the acquisition of the Selkirk Mine in August 2022,\nNEXM has been focused on de-risking the project to support future\ndevelopment decisions.\n \n\n The\n \n 12-hole drill program wrapped up\nin August\n \n and was focused on collecting samples for\nmetallurgical testing, validating legacy data and adding key data\npoints to support a future resource model update.\n \n\n SMET-25-004 returned a wide interval of continuous mineralization:\n \n 210.00 metres of 1.06% CuEq\n \n (0.40% Cu, 0.36% Ni, 0.59 ppm Pd, 0.14 ppm Pt)\n \n incl.\n \n 74.00 metres of 1.28%\nCuEq\n \n (0.45% Cu, 0.46% Ni, 0.73 ppm Pd, 0.17 ppm Pt).\n \n\n Mineralization outside the Mineral Resource Estimate (MRE) and within\nthe current conceptual pit shell demonstrated the\n \n potential for expansion of the deposit\ntoward the surface\n \n : SMET-25-001: starting at 13.00 metres from\nsurface,\n \n 45.00 metres of 0.69%\nCuEq\n \n (0.23% Cu, 0.23% Ni, 0.46 ppm Pd, 0.10 ppm Pt).\n \n\n\n\n\n\n\n Click Image To View Full Size\n \n\n\n The current cut-off of US$25.00 per tonne net smelter return defined\nin the MRE translates to 0.46% CuEq. Any material above this cut-off\ngrade could be potentially mined.\n \n\n \"The results today, combined with last week's news of drill\nhole 003, highlight multiple intercepts over 200 metres of high-grade\nmineralization, once again exceeding our expectations at Selkirk,”\nstated NEXM CEO Morgan Lekst...