Business
NSX Silver Reports High Grade Silver Drill Intercepts at Dios Padre Project
BEDFORD, NS, April 4, 2013 /CNW/ - NSX Silver Inc. (TSXV: NSY)   is pleased to announce...

About this update from Nexliving Communities Inc
[{"type":"text","content":"\n\n\n\n\n\nBEDFORD, NS, April 4, 2013 /CNW/ - NSX Silver Inc. (TSXV: NSY)  is pleased to announce assay results from its recently completed Phase\n 2 drilling program at its Dios Padre Silver Project located in Sonora\n State, Mexico.  These results are from holes DP-17-2013 through\n DP-32-2013 which were drilled in and beneath the area of historic\n mining; both in the area of old pit and adjacent to the underground\n mine workings. Seventeen (17) drill holes were completed during the\n first quarter of 2013 for a total of 3,220 meters.\n\n\nSignificant drill intercepts encountered, included the following;\n\n\n\n26.6 meters in DP-21-2013 grading 107.4 grams per tonne silver, which occurs from surface to 26.6 meters.  This hole intersected the\n old workings at 26.6 meters and was terminated.\n\n\n18.9 meters in DP- 21A - 2013 grading 234.6 grams per tonne silver and 0.179 grams per tonne gold over 12.4 meters within that interval. \n In addition, gold mineralization was encountered over a 45.4 meter\n intercept with an average grade of 0.51 grams of gold per tonne, which\n envelopes a smaller low grade silver intercept of 19.5 meters grading\n 16.1 grams of silver and 0.406 grams of gold per tonne.\n\n\n41 meters in hole DP-26-2013 grading 288.2 grams per tonne silver and 0.246 grams gold per tonne over a 25 meter interval. Within this\n section an interval of 2.5 meters grading 1.490 kilograms of silver per\n tonne and 0.351 grams per tonne gold was encountered from 101.8 to\n 104.3 meters.\n\n\n8.6 meters in hole DP- 29-2013 grading 443 grams  per tonne silver and 0.175 grams of gold per tonne\n\n\n12 meters in hole DP-30-2013 grading 208.2 grams per tonne silver which includes a section of 6 meters grading 312.6 grams of silver per\n tonne.\n\n\n\nA table of significant drill intercepts from the Phase 2 (2013) drilling\n program is attached as Appendix A.\n\n\nDrilling during the Phase 2 Program encountered multiple thick zones of\n silver mineralization ranging up to 41 meters in thickness. Also of\n significant interest is the occurrence of low grade gold mineralization\n with silver mineralization in a number of the drill holes.  Gold occurs\n in separate zones often accompanied by low silver values. Gold does not\n appear to have a spatial relationship with high grade silver\n mineralizat...