Business

NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 108.76 g/t Au over 1.40 metres and 67.23 g/t gold over 2.20 metres

TORONTO, July 24, 2025 (GLOBE NEWSWIRE) -- NexGold Mining Corp. ( TSXV: NEXG; OTCQX: NX...

articleNexgold Mining Corp.July 24, 20255/company/nexgold-mining-corp/news/nexgold-continues-to-intersect-high-grade-gold-mineralization-at-the-goldboro-open-pit-gold-project-including-10876-gt-au-over-140-metres-and-6723-gt-gold-over-220-metres
NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 108.76 g/t Au over 1.40 metres and 67.23 g/t gold over 2.20 metres

About this update from Nexgold Mining Corp.

[{"type":"text","content":"NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 108.76 g/t Au over 1.40 metres and 67.23 g/t gold over 2.20 metres\n\n\n\n TORONTO, July 24, 2025 (GLOBE NEWSWIRE) --\n \n NexGold Mining Corp.\n \n (\n \n TSXV: NEXG;\n \n\n OTCQX: NXGCF)\n \n (“\n \n NexGold\n \n ” or the “\n \n Company\n \n ”) is pleased to provide additional drill results from a recently-completed 26,854-metre diamond drill program initially announced on January 22, 2025 at the Company’s Goldboro Open Pit Gold Project (“\n \n Goldboro\n \n ”) in Nova Scotia. The drill program is primarily designed to infill specific areas of the open pit Mineral Resource identified to improve geological and grade continuity and potentially upgrade certain areas of Inferred and Indicated Mineral Resources. The assay results for an additional 11 infill diamond drill holes (BR-25-566 to 569, BR-25-571 to 573, 577, 578, 582, and 590), totalling 1,944.05 metres, were from drilling in the proposed west and east pits (\n \n Figures 1 and 2; Tables 1 and 2\n \n ).\n \n\n Kevin Bullock, President and CEO, stated: “\n \n We continue to see high-grade gold assays from both the East and West Goldbrook open pit domains and the assays continue to be generally consistent with our Mineral Resource model at Goldboro. The numerous high grade intersections and confirmatory drilling bode well for the Mineral Resource update currently being prepared.”\n \n\n\n Selected drill intersections from the 11 diamond drill holes in this news release are further detailed in\n \n Table 2\n \n and include:\n \n\n\n\n 108.76 g/t gold over 1.40 metres (from 86.60 to 88.00 metres), including 304.00 g/t gold over 0.50 metres in drill hole BR-25-578;\n \n\n\n\n 67.23 g/t gold over 2.20 metres (from 86.80 to 89.00 metres), including 286.00 g/t gold over 0.50 metres in drill hole BR-25-571;\n \n\n\n\n 1.46 g/t gold over 13.00 metres (from 160.00 to 173.00 metres), including 15.30 g/t gold over 0.50 metres in drill hole BR-25-567;\n \n\n\n\n 1.12 g/t gold over 16.50 metres (from 191.50 to 208.00 metres), including 10.25 g/t gold over 1.00 metres in drill hole BR-25-571; and\n \n\n\n\n 29.00 g/t gold over 0.50 metres (from 16.00 to 16.50 metres) in drill hole BR-25-577.\n \n\n\n\n\n Th...

More updates from Nexgold Mining Corp.