Business

Daura Gold Commences Drilling at Cerro Bayo Gold-Silver Project, Argentina

Vancouver, British Columbia--(Newsfile Corp. - February 17, 2026) - Daura Gold Corp. (TSXV: DGC) (OTC Pink: DGCOF) (the "Company" or "Daura") is pleased to announce that it has commenced its Phase One diamond drilling program at the Cerro Bayo Gold-Silver Project ("Cerro Bayo" or the "Project"), located in Santa Cruz Province, Argentina. Cerro Bayo is located in Argentina's premier gold-silver district, the Deseado Massif, which has produced 600+ million ounces of silver and 20+ million ounces..

articleNewmont CorporationFebruary 17, 20265/company/newmont-goldcorp-corp/news/daura-gold-commences-drilling-at-cerro-bayo-gold-silver-project-argentina-1
Daura Gold Commences Drilling at Cerro Bayo Gold-Silver Project, Argentina

About this update from Newmont Corporation

[{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - February 17, 2026) - Daura Gold Corp. (TSXV: DGC) (OTC Pink: DGCOF) (the "Company" or "Daura") is pleased to announce that it has commenced its Phase One diamond drilling program at the Cerro Bayo Gold-Silver Project ("Cerro Bayo" or the "Project"), located in Santa Cruz Province, Argentina. Cerro Bayo is located in Argentina's premier gold-silver district, the Deseado Massif, which has produced 600+ million ounces of silver and 20+ million ounces of gold since 1990 and hosts major mines like Newmont's Cerro Negro and Hochschild's San Jose. See the details of Daura's option agreement on Cerro Bayo in the Company's news release dated November 3, 2025 (Cerro Bayo News Release).","length":801,"tagName":"p"},{"type":"text","content":""The commencement of drilling at Cerro Bayo is a key milestone for Daura and marks the first systematic drill test of this highly prospective project," said Mark Sumner, CEO of Daura Gold. "With 15 well-defined targets supported by geochemistry and IP geophysics, this Phase One program gives us multiple opportunities for discovery and represents an important step in unlocking this project's potential."","length":429,"tagName":"p"},{"type":"text","content":"Drill Program Overview","length":22,"tagName":"p"},{"type":"text","content":"The Phase One drilling program will consist of approximately 22 diamond drill holes totaling 1,500 metres, designed to test 15 priority exploration targets generated from the integration of historical geochemical sampling, gradient array Induced Polarization ("IP") survey and defined by IP Profiling.","length":311,"tagName":"p"},{"type":"text","content":"In the northern target area, three pole-dipole IP profile lines were completed, resulting in the identification of eight drill targets. Initial drilling will focus on three priority targets, which will be tested with ten diamond drill holes totaling approximately 500 metres.","length":275,"tagName":"p"},{"type":"text","content":"In the southern target area, seven priority drill targets have been outlined and will be tested with 14 diamond drill holes totaling approximately 1,000 metres. These targets are associated with Apparent Resistivity features that coincide with the surfa...

More updates from Newmont Corporation

Cerro BayoCerro NegroThe Companydiamond drillingDauraArgentinaDeseado MassifArgentinathe Project