Business
New Age Metals Announces Results of Winter Drilling Program at the Winnipeg River-Cat Lake Lithium Claims, Southern Manitoba
(TheNewswire) June 11 th , 2024 - TheNewswire - Rockport, Ontario - New...

About this update from New Age Metals Inc
[{"type":"text","content":"New Age Metals Announces Results of Winter Drilling Program at the Winnipeg River-Cat Lake Lithium Claims, Southern Manitoba\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n June 11\n \n \n th\n \n \n , 2024\n \n \n -\n \n \n TheNewswire -\n \n \n Rockport, Ontario - New Age\nMetals Inc. (TSXV: NAM\n \n \n )\n \n \n ;\n \n \n (\n \n \n OTCQB: NMTLF\n \n \n )\n \n \n ;\n \n \n (\n \n \n FSE: P7J.F) (“NAM” or the “Company”) in conjunction\nwith its Farm-in/Joint Venture agreement with Mineral Resources Ltd.\n(“MinRes”) is pleased to announce the results of the 2024 winter\nexploration program at its Winnipeg River-Cat Lake Lithium project in\nsoutheast Manitoba. The project area hosts numerous spodumene-bearing\npegmatites and surrounds the world class Tanco mine. Drilling was\ncarried out by Platinum Diamond Drilling Inc. (“Platinum”) with\ntechnical and geological oversight by Axiom Exploration Group Ltd.\n(“Axiom”).\n \n \n \n \n Harry Barr, Chairman and CEO, stated; “We are very\npleased with the safe and efficient execution of this drill campaign\nby our contractors and technical team. The abundance of pegmatites\nintersected, coupled with anomalous geochemical results, underscores\nthe high prospectivity of our projects for Lithium-Cesium-Tantalum\n(LCT) type mineralization. The identification of new lithium-bearing\npegmatites from this campaign validates our team's targeting\nmethodology for green-fields projects and reaffirms our commitment to\nadvancing the exploration of our properties in an effort to position\nNew Age Metals as a key player in meeting the global demand for\nlithium. We look forward to announcing upcoming exploration plans for\nthe summer season that will build on these encouraging\nresults.”\n \n \n \n \n Program Details\n \n \n \n \n The program consisted of exploration drilling across\nthree of the Company’s properties including Lithium Two, Bird River\nLithium, and Lithman East. Drilling on the Lithman West property was\nhindered by insufficient ice thickness required for an ice bridge\ncrossing.\n \n \n \n \n The program commenced on January 2\n \n \n nd\n \n \n , consisting of\n56 diamond drill holes totalling 12,686 meters. A...