Business
NevGold Releases Significant Oxide Gold-Antimony Results: 11.41 g/t AuEq Over 6.1 Meters (10.60 g/t Au And 0.18% Antimony) Within 2.19 g/t AuEq Over 56.4 Meters (1.74 g/t Au And 0.10% Antimony) at the Limousine Butte Project, Nevada
Vancouver, British Columbia, Sept. 25, 2025 (GLOBE NEWSWIRE) -- NevGold Corp. (“ Ne...

About this update from Nevgold Corp
[{"type":"text","content":"NevGold Releases Significant Oxide Gold-Antimony Results: 11.41 g/t AuEq Over 6.1 Meters (10.60 g/t Au And 0.18% Antimony) Within 2.19 g/t AuEq Over 56.4 Meters (1.74 g/t Au And 0.10% Antimony) at the Limousine Butte Project, Nevada\n\n\n\n Vancouver, British Columbia, Sept. 25, 2025 (GLOBE NEWSWIRE) -- NevGold Corp. (“\n \n NevGold\n \n ” or the “\n \n Company\n \n ”)\n \n (\n \n\n TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50\n \n ) is pleased to announce further significant historic oxide gold-antimony (“Antimony”, “Sb”) results at its Limousine Butte Project (the “Project”, “Limo Butte”) in Nevada. The Company continues to expand the gold-antimony potential of the Project, highlighting its promising prospects for further exploration and development in Nevada, one of the world’s prolific mining jurisdictions.\n \n\n\n\n Key Highlights\n \n\n\n\n\n More\n \n high-grade\n \n\n oxide gold-antimony at Resurrection Ridge\n \n including:\n \n\n\n\n\n\n RR03_01: 11.41 g/t AuEq* over 6.1 meters (10.60 g/t Au and 0.18% Sb), within 2.19 g/t AuEq* over 56.4 meters (1.74 g/t Au and 0.10% Sb)\n \n\n LB010: 3.19 g/t AuEq* over 26.2 meters (2.24 g/t Au and 0.21% Sb), within 2.16 g/t AuEq* over 57.2 meters (1.45 g/t Au and 0.16% Sb)\n \n\n LB028: 4.62 g/t AuEq* over 6.1 meters (0.14 g/t Au and 1.0% Sb) within 0.66 g/t AuEq* over 128.0 meters (0.06 g/t Au and 0.13% Sb)\n \n\n LB133: 1.78 g/t AuEq* over 12.2 meters (0.11 g/t Au and 0.37% Sb)\n \n\n *Gold equivalents (“AuEq”) are based on assumed metals prices of US$2,000/oz of gold and US$35,000 per tonne of antimony (~30% discount to current spot prices), and assumed metals recoveries of 85% for gold and 70% for antimony.\n \n\n\n\n\n\n The Company has\n \n completed 8 drillholes in the current 2025 drill campaign with assays pending\n \n ; based on drilling completed by the Company at the Project since 2021, and historical drilling completed by previous operators, there is\n \n strong potential to advance to an initial gold-antimony Mineral Resource Estimate in 2025 (“MRE”)\n \n (see Figure 1, Figure 2)\n \n\n\n\n\n\n Phase II metallurgical testwork on gold and antimony continues to advance with results expected over the coming weeks\n \n\n\n\n\n\n\n Limo Butte Planned 2025 A...