Business

NevGold Intercepts 1.11% Antimony Over 6.1 Meters, Within 1.93 g/t AuEq Over 100.6 Meters (1.07 g/t Au And 0.22% Antimony) From Surface; Focus On Maiden Antimony-Gold Mineral Resource Estimate and Near-Term Antimony Production

Vancouver, British Columbia, April 09, 2026 (GLOBE NEWSWIRE) -- NevGold Corp. (“ NevGold &...

articleNevgold CorpApril 9, 20265/company/nevgold-corp/news/nevgold-intercepts-111percent-antimony-over-61-meters-within-193-gt-aueq-over-1006-meters-107-gt-au-and-022percent-antimony-from-surface-focus-on-maiden-antimony-gold-mineral-resource-estimate-and-near-term-antimony-production
NevGold Intercepts 1.11% Antimony Over 6.1 Meters, Within 1.93 g/t AuEq Over 100.6 Meters (1.07 g/t Au And 0.22% Antimony) From Surface; Focus On Maiden Antimony-Gold Mineral Resource Estimate and Near-Term Antimony Production

About this update from Nevgold Corp

[{"type":"text","content":"NevGold Intercepts 1.11% Antimony Over 6.1 Meters, Within 1.93 g/t AuEq Over 100.6 Meters (1.07 g/t Au And 0.22% Antimony) From Surface; Focus On Maiden Antimony-Gold Mineral Resource Estimate and Near-Term Antimony Production\nVancouver, British Columbia, April 09, 2026 (GLOBE NEWSWIRE) -- NevGold Corp. (“NevGold” or the “Company”) (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce further positive oxide antimony-gold drill results at its Limousine Butte Project (the “Project”, “Limo Butte”) in Nevada. All holes completed in the 2025 drill program are now released, with further assays pending on the 35 holes completed on the Crushed and Run of Mine (“ROM”) historical gold leach pads. The Company is focused on completing the maiden antimony-gold Mineral Resource Estimate (“MRE”) in Q2-2026. The maiden MRE is a key step in the development of Limo Butte with the objective of achieving near-term antimony production by 2027 from the historical gold leach pads, while also advancing the rest of the Project for future gold-antimony development. NevGold CEO, Brandon Bonifacio, comments: “It is positive to see the level of continued success at Limo Butte and it is clear that we have one of the highest grade antimony projects in North America that is near-surface and oxide. We are focused on incorporating all of the new drillhole data into the upcoming maiden antimony-gold MRE at the Project. The maiden MRE is a key step in achieving our objective of near-term antimony production by 2027 from the historical surface gold leach pads. In parallel to advancing the historical leach pads to antimony production, we will also continue to develop the rest of the gold-antimony project focused on Resurrection Ridge and Cadillac Valley with further planned drilling, engineering studies, and permitting. We have significant optionality as we look to advance Limo Butte to a near-term production and cash-flow scenario with both oxide antimony and heap leachable oxide gold.” Bonifacio continues: “Over the past 12 months, we have consistently validated that we have a large, near-surface footprint of oxide antimony-gold mineralization which is amenable to leaching, with the opportunity to produce both antimony and gold metal at th...

More updates from Nevgold Corp