Business

NevGold Announces Positive, Consistent Drill Results on Historic Gold Leach Pads Including 0.34% Antimony And 0.41 g/t Au Over 12.5 Meters; Path to Near-Term Antimony Production Continues

Vancouver, British Columbia, April 14, 2026 (GLOBE NEWSWIRE) -- NevGold Corp. (“ NevG...

articleNevgold CorpApril 14, 20263/company/nevgold-corp/news/nevgold-announces-positive-consistent-drill-results-on-historic-gold-leach-pads-including-034percent-antimony-and-041-gt-au-over-125-meters-path-to-near-term-antimony-production-continues
NevGold Announces Positive, Consistent Drill Results on Historic Gold Leach Pads Including 0.34% Antimony And 0.41 g/t Au Over 12.5 Meters; Path to Near-Term Antimony Production Continues

About this update from Nevgold Corp

[{"type":"text","content":"NevGold Announces Positive, Consistent Drill Results on Historic Gold Leach Pads Including 0.34% Antimony And 0.41 g/t Au Over 12.5 Meters; Path to Near-Term Antimony Production Continues\nVancouver, British Columbia, April 14, 2026 (GLOBE NEWSWIRE) -- NevGold Corp. (“NevGold” or the “Company”) (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce positive, consistent antimony (“Sb”) and gold (“Au”) sonic drill results (see Key Highlights and Appendix I - Drillhole Summary Table) from the historic gold leach pads at its Limousine Butte Project (the “Project”, “Limo Butte”) in Nevada. The historic gold leach pads were from mining operations in 1989-1990, which had no focus on antimony in a significantly lower gold price environment at less than US$400/oz of gold. The historic leach pads are an opportunity for potential near-term antimony production by 2027. After the drill results are received, the Company will rapidly complete a maiden antimony-gold Mineral Resource Estimate (“MRE”) in Q2-2026 on the historic gold leach pads at the Project. Key Highlights Initial sonic drillhole assays received from the Crushed Leach Pad have returned higher antimony and gold grades as compared to the earlier Phase I test pit sampling program LBS26-001: 0.34% Sb, 0.41 g/t Au over 12.5 metersLBS26-002: 0.31% Sb, 0.43 g/t Au over 13.7 metersLBS26-003: 0.33% Sb, 0.55 g/t Au over 11.0 metersLBS26-004: 0.29% Sb, 0.48 g/t Au over 12.5 metersLBS26-005: 0.27% Sb, 0.36 g/t Au over 11.0 metersLBS26-006: 0.31% Sb, 0.38 g/t Au over 12.2 metersLBS26-012: 0.30% Sb, 0.46 g/t Au over 13.1 metersLBS26-013: 0.31% Sb, 0.50 g/t Au over 14.6 metersLBS26-017: 0.22% Sb, 0.32 g/t Au over 15.5 metersLBS26-018: 0.27% Sb, 0.43 g/t Au over 14.9 metersHoles LBS26-009 to LBS26-011, LBS26-014, LBS26-015, LBS26-016 assays are pending; Holes LBS26-007 and LBS26-008 were not drilled as the drill program was modified in the field; hole numbering was set before the drill program and completed holes were sent to the assay lab in batchesNevGold test pit sampling results released January 6, 2026 from the Crushed Leach Pad averaged 0.27% Sb and 0.34 g/t Au (see Table 3); drill results received to date have higher antimony and gold gradesResults show elevated antimony-gold ...

More updates from Nevgold Corp