Business
Net Power Reports First Quarter 2025 Results and Provides Business Update
DURHAM, N.C., May 12, 2025--Net Power Inc. (NYSE: NPWR) ("Net Power" or the "Company") today announced its financial and operational results for the first quarter ended March 31, 2025.
About this update from Net Power Inc.
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":200,"height":200,"url":"https://media.zenfs.com/en/business-wire.com/fae068b4b8dac8f8845875353d43626a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/si5OGs7bQCZz61.mv5X92Q--/YXBwaWQ9aGlnaGxhbmRlcjt3PTM2MDtoPTM2MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/fae068b4b8dac8f8845875353d43626a","width":200,"height":200}},"lazy":false},{"type":"text","content":"DURHAM, N.C., May 12, 2025--(BUSINESS WIRE)--Net Power Inc. (NYSE: NPWR) ("Net Power" or the "Company") today announced its financial and operational results for the first quarter ended March 31, 2025.","length":221,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Maintained strong liquidity: Exited the quarter with over $500 million in cash, cash equivalents and investments, which are expected to fund technology development and testing for the Company’s proprietary clean power plant design.","length":231,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Continued Project Permian’s (SN1) cost reduction initiative: At Project Permian, Net Power’s planned first-of-a-kind commercial-scale facility, post-FEED work is ongoing to identify potential cost savings to deliver a financeable first commercial project. The Company is prudently advancing low-cost, project related activities, such as permitting and community engagement, while integrating advanced engineering solutions into project development to enhance overall efficiency.","length":478,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Progressed modular multi-unit feasibility study: Continued an advanced design and engineering study for a standardized, modular multi-unit plant to further reduce future project costs and meet market demand for larger generation capacity, with a goal of establishing a credible pathway to deliver a highly competitive levelized cost of energy (LCOE).","length":350,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Advanced the equipment validation testing at La Porte demonstration facility: Both Phases 1 and 2 are expected to be completed in 2025, in line with prior expectations. Despite unplanned downtime for site repairs, which are currently underway, Phase 1 testing...