Business

Murchison Minerals Announces Assay Results From 2025 Diamond Drill Program At BMK VMS Deposit, All Holes Intersecting Significant Near-surface High-grade VMS Mineralization Including Precious Metals, Grades Up To 5.52% CuEq Or 21.97% ZnEq Including, 208g/t Ag, And 1.43g/t Au

BURLINGTON, ON / ACCESS Newswire / February 4, 2026 / Murchison Minerals Ltd. HIGHLIGHTS ...

articleMurchison Minerals LtdFebruary 4, 20265/company/murchison-minerals-ltd/news/murchison-minerals-announces-assay-results-from-2025-diamond-drill-program-at-bmk-vms-deposit-all-holes-intersecting-significant-near-surface-high-grade-vms-mineralization-including-precious-metals-grades-up-to-552percent-cueq-or-2197percent-zneq-including-208gt-ag-and-143gt-au
Murchison Minerals Announces Assay Results From 2025 Diamond Drill Program At BMK VMS Deposit, All Holes Intersecting Significant Near-surface High-grade VMS Mineralization Including Precious Metals, Grades Up To 5.52% CuEq Or 21.97% ZnEq Including, 208g/t Ag, And 1.43g/t Au

About this update from Murchison Minerals Ltd

[{"type":"text","content":"Murchison Minerals Announces Assay Results From 2025 Diamond Drill Program At BMK VMS Deposit, All Holes Intersecting Significant Near-surface High-grade VMS Mineralization Including Precious Metals, Grades Up To 5.52% CuEq Or 21.97% ZnEq Including, 208g/t Ag, And 1.43g/t AuBURLINGTON, ON / ACCESS Newswire / February 4, 2026 / Murchison Minerals Ltd.HIGHLIGHTSDiamond drilling was Phase II of III of the Company's 2025 BMK Exploration Program (the \"Program\") (See October 2nd, 2025, News Release) at its 100%-owned BMK VMS Project in Saskatchewan, located approximately 175 km northwest of Foran Mining Corporations' Mcllvenna Bay VMS mine development (Figure 1);All holes were drilled at the BMK VMS Deposit (the \"Deposit\") and intersected significant zinc-copper-lead-silver-gold (Zn-Cu-Pb-Ag-Au) mineralization (within the upper 150 m), testing 550 m of the total 1,100 m strike length of the Deposit (Figure 2);Diamond drilling highlights: BMK25-005 successfully targeted expansion of mineralization along strike to the south of the indicated domain, within in the upper 150 m of the Deposit. The hole intersected 14.23 m of total composite mineralization over five intervals from 113.34 m to 143.10 m (Table 2 & Figure 3), highlighted by: 5.75 m (from 113.34 m to 119.09 m) grading 3.17% ZnEq or 0.80% CuEq (0.08g/t Au, 7.59g/t Ag, 0.39% Cu, 0.02% Pb, 0.86% Zn), including 0.52 m grading 13.04% ZnEq or 3.28% CuEq (0.34g/t Au, 21.70g/t Ag, 1.35% Cu, 0.03% Pb, 5.13% Zn); 3.80 m (from 139.30 m to 143.10 m) grading 7.13% ZnEq or 1.79% CuEq (0.07g/t Au, 4.83g/t Ag, 0.34% Cu, 0.05% Pb, 5.21% Zn), including 1.60 m grading 11.52% ZnEq or 2.90% CuEq (0.14g/t Au, 3.80g/t Ag, 0.28% Cu, 0.05% Pb, 9.70% Zn); BMK25-004 successfully targeted expansion of mineralization along strike to the north of the indicated domain, within in the upper 150 m of the Deposit. The hole confirmed an upper Zn-rich interval and discovered a lower Au-Ag-Pb rich interval, with 14 m of total composite mineralization over three intervals from 60.03 m to 82.00 m (Table 2 & Figure 4), highlighted by: 5.68 m (from 68.0 m to 73.68 m) grading 3.98% ZnEq or 1.00% CuEq (0.4g/t Au, 5.55g/t Ag, 0.60% Cu, 0.04% Pb, 1.12% Zn), including 0.50 m grading 9.24% ZnEq or 2.32% CuEq (0.19g/t Au, 20.01g/t Ag, 1.74% Cu, 0.06% Pb, 0.5% Zn); 6.82 m (from 79.18 m to 86.00 m) grading 4.99% ZnEq...

More updates from Murchison Minerals Ltd