Business
El Nino Ventures Inc. announces a 45.4 metre drill intersection assaying 8.49% Zinc, 0.18% Copper, 4.58% Lead, 0.59 gpt Gold and 152.2 gpt Silver at the Murray Brook Deposit, New Brunswick
Drilling Highlights 8.49% zinc, 0.18% copper, 4.58% lead, 0.59 gpt gold and 152.2 ...

About this update from Metalquest Mining Inc
[{"type":"text","content":"\n\n\n\n\n\nDrilling Highlights\n\n8.49% zinc, 0.18% copper, 4.58% lead, 0.59 gpt gold and 152.2 gpt silver\n over 45.4 metres in drill hole MB‐2012‐138\n\nIncluding 13.7% zinc, 0.20% copper, 9.60% lead, 1.10 gpt gold and 269.7\n gpt silver over 11.0 metres\n\n2.82% zinc, 0.65% copper, 1.78% lead, 1.57 gpt gold and 63.9 gpt silver over 11.6 metres in drill hole MB‐2012‐144\n\nMetallurgical test results to be available in fourth quarter of 2012\n\nAn updated NI43‐101 mineral resource estimation is slated for completion\n in the last quarter of 2012\n\nVotorantim Metals Canada Inc., a wholly owned subsidiary of Votorantim\n Metais which is Brazil's second largest mining company, provided further option to ELN to purchase an additional 15% in the\n project for a combined total of 50%.\n\n\nVANCOUVER, Oct. 2, 2012 /CNW/ - El Nino Ventures Inc. (\"ELN\" and the\n \"Company\") (TSXV: ELN) (OTCQX: ELNOF) (Frankfurt: E7Q) is pleased to\n announce high-grade assay results for an additional ten holes from the\n most recent round of drilling at the Murray Brook polymetallic massive\n sulfide deposit, Bathurst Mining Camp, New Brunswick. The 2012 drill\n program consisted of infill and delineation drilling. The 2012 drill\n program was completed in June. Ninety seven vertical holes were drilled\n for a total of 18,470 metres.\n\n\nMB-2012-138 was drilled to infill gaps in the previous drilling (Figures 1). Hole MB-2012-138 was drilled in the northern side of the Western Zone\n and intersected 45.4 metres of 8.49% zinc, 0.18% copper, 4.58% lead, 0.59 gpt gold and 152.2 gpt silver\n from 179.6 metres down hole, including 11.0 metres of 13.7% zinc, 0.20% copper, 9.60% lead, 1.10 gpt gold and 269.7 gpt silver\n from 214.0 metres down hole (Table 1).\n\n\nHoles MB-2012-141 to 143, 146 and 148 were drilled to better delineate\n the western boundary of the Western Zone and Holes MB-2012-144, 145,\n 147 and 149 were drilled to delineate the northeastern boundary of the\n eastern Zone (Figure 1). Western Zone appears thicker and more Zn-Pb-Ag rich where Eastern Zone\n is thinner and more Cu-Au rich.\n\n\nHole MB-2012-144, drilled in the northeastern side of the Eastern Zone\n intersected 11.6 metres of 2.82% zinc, 0.65% copper, 1.78% lead, 1.57 gpt gold and 63.9 gpt silver from 147.4 metres down hole (Table 1).\n\n...