Business
El Nino Ventures Inc. announces a 122 metre thick mineralized interval of massive sulfide mineralization assaying 6.15% Zinc, 0.10% Copper, 1.92% Lead, 0.64 gpt Gold and 70.6 gpt Silver at the Murray Brook Deposit, New Brunswick
  VANCOUVER, Aug. 28, 2012 /CNW/ - El Nino Ventures Inc. ("ELN" and the "Company")...

About this update from Metalquest Mining Inc
[{"type":"text","content":"\n\n\n\n\n\n\nDrilling Highlights \n\n\n 6.15% zinc, 0.1% copper, 1.92% lead, 0.64 gpt gold and 70.6 gpt silver\n over 112 metres in drill hole MB‐2012‐132\n\n\n Including 10.50% zinc, 0.10% copper, 3.60% lead, 1.37 gpt gold and 126.7\n gpt silver over 33 metres\n\n\n 2.73% zinc, 0.60% copper, 0.64% lead, 0.25 gpt gold and 36.7 gpt silver\n over 27.0 metres in drill hole MB‐2012‐140\n\n\n Including 4.90% zinc, 1.10% lead, 0.18 gpt gold and 50.5 gpt silver over\n 10 metres\n\n\n The continuity of mineralization along strike and at depth suggests\n potential to extend the currently defined mineralized zone.\n\n\n\n \n\n\nVANCOUVER, Aug. 28, 2012 /CNW/ - El Nino Ventures Inc. (\"ELN\" and the\n \"Company\") (TSXV: ELN); (OTCQX: ELNOF) (Frankfurt: E7Q) is pleased to\n announce high-grade assay results for an additional nine holes from the\n most recent round of drilling at the Murray Brook polymetallic massive\n sulfide deposit, Bathurst Mining Camp, New Brunswick. The 2012 drill\n program consisted of ninety seven vertical holes for a total of 18,470\n metres.\n\n\nTo see the maps and images associated with this press release please\n follow the link below:\n\n\nFigure 1 - Drill hole collar location on contour map of Murray Brook\n showing massive sulfide thickness contoured at 10 metre intervals\n (source: Votorantim Metals Canada)\n\n\nFigure 2 - View looking northeast along the horizontal at the 3D model\n of the Murray Brook deposit (grey). Location of the view plane is\n highlighted in the index map at the left top corner1.\n\n\nFigure 3 - View looking down at the 3D model of the Murray Brook deposit\n (grey). The red dashed line illustrates the collar locations of drill\n holes MB-2012-139 and MB-2012-140. \n\n\nFigure 4 - Land tenure map showing the location of the Murray Brook\n Project in the northwest part of the Bathurst Mining Camp, New\n Brunswick \n\n\nhttp://www.elninoventures.com/s/NewsReleases.asp?ReportID=543778\n\nMB-2012-132 was drilled to infill gaps in the previous drilling and test\n continuity in the central sections of the Western Mineralized Zone,\n which is thicker and more Zn-Pb-Ag rich than the Eastern Massive\n Sulfide Zone (Figures 1-2). Hole MB-2012-132 intersected 112 metres of 6.15% zinc, 0.1% copper, 1.92% lead, 0.64 gpt gold and 70.6 gpt s...