Business
Metal Energy releases results from four holes of its Phase 2 drill program at Manibridge project
(NewsDirect) Metal Energy Corp CEO James Sykes joined Steve Darling from Proactive to share m...

About this update from Metal Energy Corp
[{"type":"text","content":"Metal Energy releases results from four holes of its Phase 2 drill program at Manibridge project\n \n \n (NewsDirect)\n \n \n Metal Energy Corp CEO James Sykes\njoined Steve Darling from Proactive to share more results from the\nPhase 2 drill program at its Manibridge project in the Thompson Nickel\nBelt of Manitoba.\n \n \n Sykes told Proactive the results expand a\nshallow high-grade nickel zone that was never discovered previously at\nManibridge. The zone is 100 metres along strike, 40 to 90 metres thick\nand extends for at least 180 metres in the dip direction, and open in\nboth dip directions, he added.\n \n \n \n \n \n Contact\nDetails\n \n \n \n Proactive Canada\n \n \n +1 604-688-8158\n \n \n \n [email protected]\n \n \n \n Copyright (c) 2023 TheNewswire - All rights reserved.\n \n \n","length":1143,"tagName":"div"}]