Business
Metal Energy Assays Confirm High-Grade Nickel in All Drill Holes From Phase One Drill Program
Metal Energy Assays Confirm High-Grade Nickel in All Drill Holes From Phase One Drill Pro...

About this update from Metal Energy Corp
[{"type":"text","content":"\n \n \n \n Metal Energy Assays Confirm High-Grade Nickel in All Drill Holes From Phase One Drill Program\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n Highlights Include:\n \n \n \n \n \n 0.92% Ni eq. over\n \n 32.95 m\n \n starting at\n \n 150.45 m\n \n including 1.24% Ni eq. over\n \n 11.45 m\n \n at\n \n 169.1 m\n \n in drill hole MNB004\n \n \n \n \n 0.81% Ni eq. over\n \n 13.5 m\n \n starting at\n \n 337.5 m\n \n in drill hole MNB003\n \n \n \n \n 1.13% Ni eq. over\n \n 9.0 m\n \n starting at\n \n 700.0 m\n \n including 1.62% Ni eq. over\n \n 5.0 m\n \n at\n \n 701.0 m\n \n in drill hole MNB006\n \n \n \n \n Two drill holes intersected thick composite mineralization over 100 and 80 metres in length with 40% and 55% of those intervals being mineralized, respectively\n \n \n \n \n \n TORONTO\n \n ,\n \n Aug. 3, 2022\n \n /CNW/ - Metal Energy Corp. (the \"\n \n Company\n \n \" or \"\n \n Metal Energy\n \n \") (TSXV: MERG) is pleased to announce assay results (\n \n Table 1\n \n ) from the Phase One drill program (the \"\n \n Program\n \n \") completed in March and April on the high-grade nickel and copper-cobalt Manibridge project (the \"\n \n Project\n \n \" or \"\n \n Manibridge\n \n \") in the Thompson Nickel Belt, Manitoba.  The Program successfully intersected high-grade nickel-sulphide mineralization over a one kilometre strike length within the shadow of the past-producing Manibridge mine that produced 1.3 million tonnes at 2.55% nickel and 0.27% copper from 1971 to 1977.\n \n \n \"The results from the Program are very encouraging and better than expected. They've answered many of our preliminary questions on Manbridge's Phase 1.  These six holes have;\n \n \n \n Intersected high-grade nickel mineralization in every drill hole which demonstrates mineralization over a minimum one kilometre strike length;\n \n \n Discovered at least 4 zones of mineralization which provides for multiple zones of overlapping mineralization;\n \n \n Intersected thick intervals of continuou...