Business
Melkior Intersects 81 Meters of .036% Anomalous Copper Including 6.0 Meters of .127% Copper in DDH CAR-19-03A on the Carscallen Project
(via TheNewswire) Timmins, Ontario - TheNewswire - December 4, 2019 -...

About this update from Melkior Resources Inc.
[{"type":"text","content":"Melkior Intersects 81 Meters of .036% Anomalous Copper Including 6.0 Meters of .127% Copper in DDH CAR-19-03A on the Carscallen Project(via TheNewswire)\n \n \nTimmins, Ontario - TheNewswire - December 4, 2019 - Melkior Resources Inc. (\"Melkior\") (TSXV:MKR) is pleased to announce it has intersected .127% Copper over 6.0 meters from 467.0 to 473.0 meters and .036% Copper over 81.0 meters from 432.0 to 513.0 meters in ddh CAR-19-03A. These intercepts occur below and overlap the bottom portion of the gold intercept reported November 28, 2019 of 23.5 g/t Gold over 8.0 meters from 426.0 to 434.0 meters in DDH Car-19-03A. In addition, .067% Zinc over 36 meters was intersected immediately below the anomalous copper from 513.0 to 549.0 meters in the same drill hole (see Figure 1). The Carscallen Project is located approximately 25 km west of the town of Timmins, Ontario and 5 km west of Pan American Silver's Timmins West Mine (see table below).\n\n \n \nRESULTS FROM DRILL HOLES\n\n \n\nHole ID\n\n\n\n\nFrom (m)\n\n\n\n\nTo (m)\n\n\n\n\nLength (m)\n\n\n\n\nAu (g/t)\n\n\n\n\nCu (ppm)\n\n\n\n\nZn (ppm)\n\n\n \n \n \n \n \n \n \n\n\nCAR-19-01\n\n\n\n\n98.5\n\n\n\n\n103.5\n\n\n\n\n5.0\n\n\n\n\n1.27\n\n\n \n \n\n\nIncluding\n\n\n\n\n103.0\n\n\n\n\n103.5\n\n\n\n\n0.5\n\n\n\n\n8.10\n\n\n \n \n \n\n\n108.5\n\n\n\n\n113.5\n\n\n\n\n5.0\n\n\n\n\n1.12\n\n\n \n \n\n\nIncluding\n\n\n\n\n108.5\n\n\n\n\n109.0\n\n\n\n\n0.5\n\n\n\n\n4.47\n\n\n \n \n\n\nCAR-19-02\n\n\n\n\n143.5\n\n\n\n\n144.5\n\n\n\n\n1.0\n\n\n\n\n4.27\n\n\n \n \n\n\nCAR-19-03A\n\n\n\n\n426.0\n\n\n\n\n434.0\n\n\n\n\n8.0\n\n\n\n\n23.50\n\n\n \n \n\n\nIncluding\n\n\n\n\n430.0\n\n\n\n\n434.0\n\n\n\n\n4.0\n\n\n\n\n47.0\n\n\n \n \n\n\nIncluding\n\n\n\n\n433.0\n\n\n\n\n433.5\n\n\n\n\n0.5\n\n\n\n\n372.0\n\n\n \n \n \n\n\n432.0\n\n\n\n\n513.0\n\n\n\n\n81.0\n\n\n \n\n\n.036\n\n\n \n\n\nIncluding\n\n\n\n\n467.0\n\n\n\n\n473.0\n\n\n\n\n6.0\n\n\n \n\n\n.127\n\n\n \n \n\n\n513.0\n\n\n\n\n549.0\n\n\n\n\n36.0\n\n\n \n \n\n\n.067\n\n\n\n \n* Stated lengths are core lengths as drilled. True widths are estimated to be 80% of reported core length intervals. \n\n \n \nIn 2012, Dr. Eric Hebert, P.h.D, P.Geo of GeoVector Management Inc., intersected 3.55% Copper over 1.35 meters from 528.0 to 529.35 meters in CAR-79-2012 (March 26, 2012 press release) consisting of \"stringers of copper sulphide mineralizatio...