Business

Dolly Varden Silver Intersects 467 g/t Silver over 15.32 Meters, Including 1,309 g/t Silver over 2.32 Meters at Wolf Vein

Vancouver, British Columbia--(Newsfile Corp. - January 20, 2026) - Dolly Varden Silver Corporatio...

articleDolly Varden Silver CorporationJanuary 20, 20263/company/maxim6ixcom20s-org/news/dolly-varden-silver-intersects-467-gt-silver-over-1532-meters-including-1309-gt-silver-over-232-meters-at-wolf-vein
Dolly Varden Silver Intersects 467 g/t Silver over 15.32 Meters, Including 1,309 g/t Silver over 2.32 Meters at Wolf Vein

About this update from Dolly Varden Silver Corporation

[{"type":"text","content":"Dolly Varden Silver Intersects 467 g/t Silver over 15.32 Meters, Including 1,309 g/t Silver over 2.32 Meters at Wolf VeinVancouver, British Columbia--(Newsfile Corp. - January 20, 2026) - Dolly Varden Silver Corporation (TSXV: DV) (NYSE American: DVS) (FSE: DVQ) (the \"Company\" or \"Dolly Varden\") is pleased to announce results from drilling on the Wolf Vein. A total of 32 drill holes were completed at the Wolf Vein in the 2025 program combining infill and vertical extension as well as southwest step-outs towards the projected position of the Central Valley Fault. High-grade silver mineralization was intersected in infill drill holes including DV25-435 which returned 467 g/t silver over 15.32 meters, including 1,309 g/t silver over 2.32 meters within the mineralized plunge.A very significant finding during the 2025 program was the discovery of mineralization similar to that of the Torbrit silver deposit at a shallow depth in drilling across the Central Valley Fault (CVF). 518 g/t silver was intersected over 0.52 meters in drill hole DV25-470. A portion of the total 56,131 meter drilled in 2025 at the Company's 100% owned Kitsault Valley Silver and Gold Project was drilled at the Wolf Vein to expand and infill along the plunge of high-grade silver mineralization to the southwest and test across the CVF once it was encountered.Highlights from Wolf Vein Infill and Vertical expansion DrillingDV25-435: 467 g/t Ag, 0.60% Pb and 0.66% Zn over 15.32 meters, including  1,309 g/t Ag, 0.19% Pb and 0.24% Zn over 2.32 meters   DV25-436: 323 g/t Ag, 1.16% Pb and 2.13% Zn over 22.86 meters, including   644 g/t Ag, 1.33% Pb and 1.33% Zn over 5.74 meters Zone 2 319 g/t Ag, 0.31% Pb and 1.15% Zn over 13.08 meters, including   1,820 g/t Ag, 0.07% Pb and 0.47% Zn over 0.50 meter   DV25-439: 659 g/t Ag, 5.30% Pb and 9.27% Zn over 4.87 meters, including  3,450 g/t Ag, 2.02% Pb and 5.56% Zn over 0.55 meter   DV25-461: 419 g/t Ag, 1.90% Pb and 1.17% Zn over 10.90 meters, including   2,300 g/t Ag, 13.90% Pb and 5.55% Zn over 1.00 meter  \"In addition to the successful infill and expansion of the Wolf Vein, the discovery of silver bearing mineralization similar to the Torbrit Deposit is a very significant step in connecting ...

More updates from Dolly Varden Silver Corporation