Business
Maple Gold Reports Multiple High-Grade Gold Intercepts from Continued Step-Out Drilling at Joutel, Including 17.9 g/t Gold over 3.9 Metres Within 8.6 g/t Gold over 10.4 Metres in the Telbel Mine Area
Vancouver, British Columbia--(Newsfile Corp. - April 1, 2026) - Maple Gold Mines Ltd. (TSXV: MGM...

About this update from Maple Gold Mines Ltd
[{"type":"text","content":"Maple Gold Reports Multiple High-Grade Gold Intercepts from Continued Step-Out Drilling at Joutel, Including 17.9 g/t Gold over 3.9 Metres Within 8.6 g/t Gold over 10.4 Metres in the Telbel Mine AreaVancouver, British Columbia--(Newsfile Corp. - April 1, 2026) - Maple Gold Mines Ltd. (TSXV: MGM) (OTCQX: MGMLF) (FSE: M3G0) (\"Maple Gold\" or the \"Company\") today announced additional assay results from seven (7) drill holes completed during its ongoing, fully-funded 30,000-metre (\"m\") winter drill campaign (the \"Program\") at its 100%-owned Douay Gold Project (\"Douay\") and Joutel Gold Project (\"Joutel\") (together, \"Douay/Joutel\" or the \"Property\") located along the Casa Berardi-Douay Gold Trend in Québec, Canada.HighlightsDrill hole JO-26-11 returned two (2) high-grade gold intervals including 17.9 grams per tonne of gold (\"g/t Au\") over 3.9 m within 8.6 g/t Au over 10.4 m and 16.9 g/t Au over 3.3 m within 3.8 g/t Au over 17.1 m, located approximately 50 m above the Telbel Mine workings. JO-26-11 gold intercepts are located approximately 50 m below previously reported drill hole JO-25-05, which returned 8.5 g/t Au over 8.0 m (see news release dated February 26, 2026).In the Eagle Mine area, drill hole EM-26-19 returned two (2) intervals including 2.1 g/t Au over 12.9 m and 1.4 g/t Au over 17.0 m and drill hole EM-26-20 returned 1.1 g/t Au over 13.7 m. Current drilling at Joutel has extended high-grade gold mineralization up to 450 m beyond the historical Eagle-Telbel underground workings and the system remains open in multiple directions.Maiden Joutel mineral resource estimate (\"MRE\"), excluding current drilling, remains on track for delivery in H1 2026.Including the seven (7) holes reported today, the Company has now reported drill results for a total of 14 holes (~6,800 m) out of 48 holes (~21,800 m) completed to date as part of the Program, with additional drilling planned in 2026.\"These latest results continue to build confidence in the scale, continuity and grade of the gold system at Joutel,\" stated Kiran Patankar, President and CEO of Maple Gold. \"Multiple step-out holes in this first drilling phase have now returned thick, high-grade gold intercepts at shallow depths within the primary stratigraphic target proximal to existing underground infrastructure, highlighting the opportunity for significant...