Business

Maple Gold Extends High-Grade Gold at Joutel and Strengthens Technical Team with Appointment of Vice President, Exploration

Consistent, high-grade gold intervals in the Telbel mine area include 8.5 grams per tonne of gold ("g/t Au") over 8.0 meters ("m") (drill hole JO-25-05) and 7.6 g/t Au over 5.3 m (drill hole JO-25-01)Shallow, high-grade intervals in the Eagle-Telbel area include 3.0 g/t Au over 6.8 m (drill hole JO-25-06) and 5.3 g/t Au over 6.8 m (drill hole JO-25-07)Three drill holes (JO-25-01, JO-25-05 and JO-25-07) included five individual assays greater than 20.0 g/t Au with a high of 40.8 g/t Au over 0.5 m

articleMaple Gold Mines LtdFebruary 26, 202620/company/maple-gold-mines-ltd/news/maple-gold-extends-high-grade-gold-at-joutel-and-strengthens-technical-team-with-appointment-of-vice-president-exploration
Maple Gold Extends High-Grade Gold at Joutel and Strengthens Technical Team with Appointment of Vice President, Exploration

About this update from Maple Gold Mines Ltd

[{"type":"list","items":[{"val":[{"type":"text","content":"Consistent, high-grade gold intervals in the Telbel mine area include 8.5 grams per tonne of gold ("g/t Au") over 8.0 meters ("m") (drill hole JO-25-05) and 7.6 g/t Au over 5.3 m (drill hole JO-25-01)","length":220,"tagName":"p"}]},{"val":[{"type":"text","content":"Shallow, high-grade intervals in the Eagle-Telbel area include 3.0 g/t Au over 6.8 m (drill hole JO-25-06) and 5.3 g/t Au over 6.8 m (drill hole JO-25-07)","length":154,"tagName":"p"}]},{"val":[{"type":"text","content":"Three drill holes (JO-25-01, JO-25-05 and JO-25-07) included five individual assays greater than 20.0 g/t Au with a high of 40.8 g/t Au over 0.5 m (drill hole JO-25-05)","length":168,"tagName":"p"}]},{"val":[{"type":"text","content":"Large step-out drilling at Joutel (>100 m from previously mined-out stopes) demonstrates that high-grade gold mineralization extends well beyond historical underground workings and remains open in multiple directions","length":219,"tagName":"p"}]},{"val":[{"type":"text","content":"Maiden Joutel mineral resource estimate ("MRE") excluding current drilling to be included in an updated MRE expected in H1 2026","length":137,"tagName":"p"}]},{"val":[{"type":"text","content":"Fully funded 30,000-m Douay/Joutel Program advancing with additional drilling planned in 2026; seven (7) holes reported today out of 39 holes (~17,000 m; ~57%) completed to date","length":177,"tagName":"p"}]},{"val":[{"type":"text","content":"Technical team strengthened with the appointment of Pascal Lessard, P.Geo., a 30-year mining veteran, as Vice President, Exploration and the promotion of Ian Cunningham-Dunlop, P.Eng., to Executive Vice President, overseeing strategy and execution across all projects.","length":268,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":1343,"olType":false},{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - February 26, 2026) - Maple Gold Mines Ltd. (TSXV: MGM) (OTCQX: MGMLF) (FSE: M3G0) ("Maple Gold" or the "Company") today announced initial assay results from seven (7) drill holes completed during its ongoing, fully-funded 30,000-m winter drill campaign (the "Program") at its 100%-owned Douay Gold Project ("Douay") and Joutel Gold Project ("Joutel") (together, "Douay/Jout...

More updates from Maple Gold Mines Ltd

Vice PresidentGold ProjectVice PresidentGold MinesAuThe Companydrill holesGold minesJoutelgold mineralizationlode gold