Business
Expansion Drilling at the SW Pit Intersects 64.9 g/t Au and 87.72 g/t Ag over 2.00m (Estimated True Width) 50m From Surface
Expansion Drilling at the SW Pit Intersects 64.9 g/t Au and 87.72 g/t Ag over 2.00m (Esti...

About this update from Mako Mining Corp.
[{"type":"text","content":"\n \n \n \n Expansion Drilling at the SW Pit Intersects 64.9 g/t Au and 87.72 g/t Ag over 2.00m (Estimated True Width) 50m From Surface\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; FONT-SIZE: 8PT; FONT-FAMILY: ARIAL; COLOR: BLACK; MARGIN:0em; BORDER-TOP:black 1pt; BORDER-RIGHT:black 1pt; BORDER-BOTTOM:black 1pt; BORDER-LEFT:black 1pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE; BORDER-TOP:1pt black; BORDER-RIGHT:1pt black; BORDER-BOTTOM:1pt black; BORDER-LEFT:1pt black\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n TSX-V: MKO; OTCQX: MAKOF\n \n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n Sept. 6, 2022\n \n \n /CNW/ -\n \n Mako Mining Corp.\n \n (TSXV: MKO) (OTCQX: MAKOF) (\"Mako\" or the \"Company\") is pleased to report additional high-grade drill results from an area adjacent to the current open pit mining operations at the San Albino West Pit in northern\n \n Nicaragua\n \n . Two of the Company's seven drill rigs are currently focused on this SW Pit area.\n \n \n The objectives of the SW Pit drilling program are to: 1) increase the overall size of the San Albino Gold Deposit, which remains open along strike and at depth; 2) test extensions of the mineralization beyond the permitted pit limit; and 3) provide information necessary to begin mining this area early next year.\n \n \n To date a total of 32,436 meters (m) in 259 drill holes (2011-2022) have been completed in the area. Most of the drilling intersected mineralization within, or immediately outside, the current permitted pit.\n \n \n All intersections described in this press release fall outside the 2020 Mineral Resource Estimate (\"2020 Resource\").\n \n \n A technical report for the current mineral resource estimate at San Albino is available under the Company's SEDAR profile at\n \n www.sedar.com\n \n and available on the Company's website at\n \n www.makominingcorp.com\n \n (see press release dated\n \n October 19\n \n , 2020).\n \n \n \n Highlights of...