Business
InvestmentPitch Media Video Discusses Lomiko Metals Announcement of Positive Results from the Preliminary Economic Assessment on its La Loutre Graphite Project in Southern Quebec - Video Available on Investmentpitch.com
Vancouver, British Columbia--(Newsfile Corp. - August 3, 2021) - Lomiko Metals (TSXV: LMR) (OT...

About this update from Lomiko Metals Inc.
[{"type":"text","content":"InvestmentPitch Media Video Discusses Lomiko Metals Announcement of Positive Results from the Preliminary Economic Assessment on its La Loutre Graphite Project in Southern Quebec - Video Available on Investmentpitch.comVancouver, British Columbia--(Newsfile Corp. - August 3, 2021) - Lomiko Metals (TSXV: LMR) (OTCQB: LMRMF) (FSE: DH8C) has announced positive results from the Preliminary Economic Assessment on its La Loutre Graphite Project in southern Quebec. The 100% owned La Loutre Project is located in the Nominingue-Chénéville Deformation Zone in Quebec. The property, which consists of one large contiguous block of 42 mineral claims totaling 2,509 hectares or approximately 25 square kilometres, is located approximately 117 kilometres northwest of Montréal in southern Québec, 230 kilometres southwest of the Nouveau Monde Matawinie Project and 100 kilometres southeast of the Imerys' Lac-des-îles mine.The PEA was completed by Ausenco Engineering Canada, the Canadian division of the Australian-based global engineering firm with a 30 year track record with projects spanning more than 80 locations worldwide.Cannot view this video? Visit:http://www.investmentpitch.com/video/1_f3uo6sve/Lomiko-Metals-has-announced-positive-results-from-the-Preliminary-Economic-Assessment-on-its-La-Loutre-Project-in-southern-QuebecFor more information, please view the InvestmentPitch Media \"video\" which provides additional information about this news along with some video comment from Lomiko's President and CEO, A. Paul Gill. If this link is not enabled, please visit www.InvestmentPitch.com and enter \"Lomiko\" in the search box.Based on a drill hole database containing 117 drill holes, consisting of 15,160 metres of drilling and 8,850 assay intervals, the project has a mineral resource estimate of 23,165 kilo tonnes of 4.51% graphite for 1.04 metric tonnes of graphite in the Indicated category, and 46,821 kilo tonnes of 4.01% graphite for 1.9 metric tonnes of graphite in the Inferred category, using a 1.5% cut-off grade. The cut-off grade is based on a processing cost of CDN$11.85 per tonne, and General and Administrative Costs of CDN$2.37 per tonne. A cut-off grade of 1.5% has been used for the base case of the resource estimate, which more than covers the Process and General and Administrative Costs.The mine plan includes ...