Business

Lode Gold Closes Second Tranche of Private Placement for Total Financing of $1.2 Million to Initiate Work at the Fremont Mine in California

Toronto, Ontario--(Newsfile Corp. - June 16, 2025) - Lode Gold Resources Inc. (TSXV: LOD) (OTCQB...

articleLode Gold Resources IncJune 16, 20254/company/lode-gold-resources-inc/news/lode-gold-closes-second-tranche-of-private-placement-for-total-financing-of-dollar12-million-to-initiate-work-at-the-fremont-mine-in-california
Lode Gold Closes Second Tranche of Private Placement for Total Financing of $1.2 Million to Initiate Work at the Fremont Mine in California

About this update from Lode Gold Resources Inc

[{"type":"text","content":"Lode Gold Closes Second Tranche of Private Placement for Total Financing of $1.2 Million to Initiate Work at the Fremont Mine in CaliforniaToronto, Ontario--(Newsfile Corp. - June 16, 2025) - Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) (\"Lode Gold\" or the \"Company\") is pleased to announce it has closed the second tranche of its non-brokered private placement offering. Proceeds will be used to advance work at the Fremont Mine in Mariposa, California. This is an advanced-stage exploration and development asset, where recently an NI 43 -101 compliant mineral resource estimate (MRE 2025) was completed with a new geological model that separates vein mineralization from stockwork: 1.34 Moz at 4.4 g/t (3 g/t cut off, average true width: 16.8 m).1Table 1To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/4064/255791_lode_table1.jpgFremont was previously mined at 10.7 g/t. Only 8% of the total mineral resource, filed at SEDAR+ (April 2025) has been extracted, mostly in the first 250 m. This is a structurally controlled orogenic deposit with excellent continuity. Exploration upside exists as it is open at depth and on strike. Three step-out holes at 1,300 m hit structure and were mineralized.Upcoming 2025-2026 Catalysts: Rehabilitation of 2 km of the 23 km of underground workingsAccess to three of the adits, out of a total of 14Channel sampling to upgrade resources to M&IMetallurgy and Recovery StudiesGeotechnical work and rock mechanics assessmentsUnderground drilling 3,000 m (to initiate Pre-Feasibility Study)  Completion of Pre-Feasibility Study (underground bulk mining and other optimized methods will be evaluated) \"We had a busy year. We completed corporate restructuring, a joint venture, the creation of a spin-co, and advanced all three of our assets in Yukon, New Brunswick and California. Over the past 12 months, we delivered three technical reports. At Fremont, two pivotal findings stand out: first, mineralization in the stockworks—outside the veins—remains completely untouched when mining was suspended during World War II (1942), when gold was just $35/oz. Second, at a 1 g/t cut-off, we see an impressive average true width of 53 meters,\" comments Wendy T. Chan, CEO and Director of Lode Gold. \"The 2023 Preliminary Economic Assessment (PEA) i...

More updates from Lode Gold Resources Inc