Business

NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project

NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium ...

articleLithium South Development CorporationAugust 9, 20183/company/lithium-south-development-corp/news/nrg-announces-excellent-pumping-well-test-results-at-flagship-hombre-muerto-north-lithium-project
NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project

About this update from Lithium South Development Corporation

[{"type":"text","content":"\n\n\n\nNRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, Aug. 9, 2018\n\n\n\nVANCOUVER, Aug. 9, 2018 /CNW/ - NRG Metals Inc. (\"NRG\" or the \"Company\") (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina. The well is located on the Tramo Claim portion of the project group.\n\nThis pumping well was drilled immediately adjacent to the first exploration diamond core hole following the excellent results from the recent sampling that provided assay results of 401 meters of 900 mg/L lithium with very good chemistry as reported in the Company's press release dated June 28, 2018. Together with information from the diamond core drilling program, data from the pumping test will be used to calculate resources and reserves for the project. If warranted, this pumping well can be used for production as part of the fast-track development of the project.  \n\nNRG Metals completed a 72-hour pumping test that produced 26 liters per second of brine. The test was limited by the capacity of the pump causing our test to rapidly reach the limits of the pumping equipment and measurement devices at the site. The pumping test was designed and monitored by our independent technical consultants, Montgomery & Associates of Santiago, Chile.\n\nBased on these positive initial pump test results, our technical team believes that the well could have significant additional pumping capability. The Company is planning to mobilize additional equipment to run a test with a higher capacity pumping system as soon as possible.\n\nJosé de Castro, Chief Operating Officer of NRG Metals Inc., commented, \"We are very pleased with the results of the pumping test at Hombre Muerto North. These results have removed a significant part of the risk associated with developing a lithium operation. We are seeing exceptionally high grade...

More updates from Lithium South Development Corporation