Business
Gold Port Intercepts 39 meters of 1.74 Grams Per Tonne Gold in Hole AK-34 of an Eight Hole Drill Program
Symbol: GPO TSX-V VANCOUVER, Nov. 16 /CNW/ - Gold Port Resources Ltd. (The "Company")(TSX-V:GPO)...

About this update from Lithium South Development Corporation
[{"type":"text","content":"\n\n\n\nSymbol: GPO TSX-V\n\n\nVANCOUVER, Nov. 16 /CNW/ - Gold Port Resources Ltd. (The\n"Company")(TSX-V:GPO) is pleased to report drill results from an eight hole\nprogram at the Akaiwong Project, located in Cuyuni Mining District 4, Guyana,\nSouth America. The Akaiwong Project is 100% owned by the Company and located\n20 kilometers southeast of the significant gold discovery at Aurora by Guyana\nGoldfields (GUY.TO).\n\n\nEight holes were completed earlier this year. Hole AK-33 was a short hole\nof 20 meters terminated due to equipment failure. Hole AK-33A was a restart of\nAK-33 and was drilled at a 70 degree angle to 134 meters. Hole AK-34 was an\nangle hole of 70 degrees drilled to a depth of 152 meters. All other holes\nwere short vertical holes drilled to a target depth of 100 meters. All values\nare reported at the end of this release.\n\n\nLocating Hole AK-33A as a center point, the following hole locations are\npresented and subject to ground re-verification:\n\n\n- AK-34 located 60 meters northwest\n- AK-35 located 100 meters north\n- AK-36 located 100 meters northeast\n- AK-37 located 100 meters east\n- AK-38 located 100 meters southeast\n- AK-39 located 120 meters south\n- AK-40 located 30 meters south east\n\n\nSelect intercepts from holes AK-33A, AK-33B, AK-34, AK-36, and AK-38 and\nAK-40 are presented here with all values reported in grams per tonne gold. All\nassay work was completed by ACME Laboratories of Guyana, a certified\nlaboratory. Sample preparation was completed in Georgetown Guyana, with final\nassay work completed in Chile, South America. On site security was provided by\nthe Company and supervised by Mr. Brian Sucre, Project Geologist.\n\n\nHole AK-33: 0 to 17 meters of 1.27 gpt gold (hole terminated due to\nmechanical failure).\n\n\nHole AK-33A: 0 to 34 meters of 0.78 gpt gold including 7 meters of 1.63\ngpt gold from 10 to 16 meters; from 130 to 133 meters, 6 meters of 1.63 gpt\ngold; and the hole bottoming in 4 meters of 1.28 gpt gold.\n\n\nHole AK-33B: 0 to 28 meters of .947 gpt gold including 12 meters of 1.5\ngpt gold; from 41 to 52 meters, 11 meters of .713 gpt gold; and from 80 to 89\nmeters, 10 meters of .990 gpt gold with the hole going out of the zone.\n\n\nHole AK-34: 39 meters of 1.74 gpt gold from 0 to 39 meters; and 10 meters\nof 0.61 gpt gold from 80 to 89 meters.\n\n\nHole...