Business
Environmental Base Line Study Update
Environmental Base Line Study Update Canada NewsWire VANCOUVER, BC ...

About this update from Lithium South Development Corporation
[{"type":"text","content":"\n \n \n \n Environmental Base Line Study Update\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n VANCOUVER, BC\n \n ,\n \n Nov. 17, 2021\n \n /CNW/ --\n \n Lithium South Development Corporation\n \n (the \"Company\") (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ).  The Company is pleased to provide an update on progress with the ongoing environmental baseline study at the Hombre Muerto North Lithium Project, being conducted by EC & Asociados of Salta, Argentine. EC & Asociados have advised that they have completed study of the onsite environmental conditions during the dry season and will be providing an updated report expected in early December.  The second phase of the study will commence during the first two weeks of December and will involve study of the environmental conditions on site during the wet season.  The environmental base line study will fulfill requirements under the General Environmental Law, Mining Code No. 24.585.\n \n \n Company Vice President,\n \n Fernando Villarroel\n \n is quoted: \"We are very pleased with the progress made to date for environmental permitting.  Conclusion of the baseline study will provide a key element of a planned Feasibility Study.\"\n \n \n \n About Lithium South\n \n \n \n Lithium South is focused on developing the Hombre Muerto North Lithium Project (HMN Li Project), located on the Hombre Muerto Salar, a major lithium-producing salar in\n \n Argentina\n \n . The property is adjacent to land under development by the Korean multinational corporation POSCO, which acquired the ground from Galaxy Resources Ltd. for US\n \n $280 million\n \n .  The Company completed a Preliminary Economic Assessment of the HMN Li Project in 2019, utilizing conventional evaporation extraction.\n \n \n The Company is evaluating conventional evaporation as a process method, and Direct Lithium Extraction (DLE) as an alternative method.  Three candidates for DLE are currently being evaluated.  Two, 2,000-gallon bulk brine samples are in transit; one sample is headi...