Business
Lithium Americas Reports First Quarter 2026 Results
VANCOUVER, British Columbia, May 14, 2026--Lithium Americas Corp. (TSX: LAC) (NYSE: LAC) ("Lithium Americas" or the "Company") announced that it has filed its Quarterly Report on Form 10-Q, which includes the Company’s unaudited condensed consolidated interim financial statements ("Financials") for the three months ended March 31, 2026 ("Q1 2026"), and provided an update on its Thacker Pass lithium project in Humboldt County, Nevada ("Thacker Pass" or the "Project").
About this update from Lithium Americas Corp.
[{"type":"image","alt":"Ironworkers installing structural steel on the second level of the Filter Building.","displaySize":"","headline":null,"caption":"Ironworkers installing structural steel on the second level of the Filter Building.","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":320,"url":"https://media.zenfs.com/en/business-wire.com/0c62ae98bad9b6e3e3001d34eb906122"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/D4u7OFkl4zVUHsLE1fhQeg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTY0MA--/https://media.zenfs.com/en/business-wire.com/0c62ae98bad9b6e3e3001d34eb906122","width":480,"height":320},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/MN6qdk4kFIKzvuG1fgU5LA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTY0MDtoPTQyNw--/https://media.zenfs.com/en/business-wire.com/0c62ae98bad9b6e3e3001d34eb906122","width":480,"height":320}},"lazy":false},{"type":"image","alt":"The first of more than 100 miles of permanent electrical cable was pulled at Thacker Pass.","displaySize":"","headline":null,"caption":"The first of more than 100 miles of permanent electrical cable was pulled at Thacker Pass.","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":320,"url":"https://media.zenfs.com/en/business-wire.com/bd3ed63b92eae2a402c370938b7cf27d"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/R5xlCdEVquDNjdF0eP8guw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTY0MA--/https://media.zenfs.com/en/business-wire.com/bd3ed63b92eae2a402c370938b7cf27d","width":480,"height":320},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/YYB125HqrUihHXU.fIp4cQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTY0MDtoPTQyNw--/https://media.zenfs.com/en/business-wire.com/bd3ed63b92eae2a402c370938b7cf27d","width":480,"height":320}}},{"type":"image","alt":"Bicarbonate reactors for the Lithium Carbonate Crystallization facility have arrived at Thacker Pass.","displaySize":"","headline":null,"caption":"Bicarbonate reactors for the Lithium Carbonate Crystallization facility have arrived at Thacker Pass.","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":320,"url":"https://media.zenfs.com/en/business-wire.com/47efc8e9dc76669528d2ae3ee69bce50"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/2qEobyEzSCMZuq9cTjNW9A--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTY0MA--/https://media.zenfs.com/en/business-w...