Business

King's Bay Gold Corporation Discloses Additional Drilling Results at the Menary Project in the Kenora Mining Division of Ontario

(via Thenewswire.ca) King's Bay Gold Corporation (TSX.V: KBG) is pleased to announce further ...

articleLion Rock Resources IncSeptember 27, 20113/company/lion-rock-resources-inc/news/kings-bay-gold-corporation-discloses-additional-drilling-results-at-the-menary-project-in-the-kenora-mining-division-of-ontario
King's Bay Gold Corporation Discloses Additional Drilling Results at the Menary Project in the Kenora Mining Division of Ontario

About this update from Lion Rock Resources Inc

[{"type":"text","content":"\nKing's Bay Gold Corporation Discloses Additional Drilling Results at the Menary Project in the Kenora Mining Division of Ontario\n\n(via Thenewswire.ca)\n\n \nKing's Bay Gold Corporation (TSX.V: KBG) is pleased to announce further high-grade gold intersections within an approximate 100m wide x 200m long x 100m deep geologically productive area at the Wagg Gold Occurrence on the Menary Project. Since the late summer of 2010, the Company has now drilled 29 holes for 3,484.7 metres of BQ core on this geologically productive area. During its 2011 summer field season, the Company drilled 13 of those 29 holes for 1,567.8 metres of BQ core. The results from these drill-holes were significant in that they intersected anomalous to significant gold mineralization over core length intervals from 0.3m to 11.0m and remain open at depth and in all directions.\n\n\n \nSummer 2011 Drill Results\n\n\n \nGiven the positive results obtained from MIN 10-01 to MIN 10-16 at the Wagg occurrence during the spring and fall of 2010, the Company announced in a news release dated May 11th, 2011 that it had mobilized its geologist and drilling contractor to the Menary Property. Drilling occurred throughout most of the summer and Hole MIN 11-29 is presently underway at the time of this news release. Work during the summer also included extensive prospecting and mapping program of outcrops over the entire property. Results for holes MIN 11-17 to MIN 11-26 follow below. True widths are not known at this point in time due to the complex nature of the veins and structural deformation within the zone of interest.\n\n\n \n\n-----------------------------------------------------------------\n|Drill Hole|Dip |Grade (g/t) |Intercept Length|From (m)|To (m)|\n|---------------------------------------------------------------|\n|MIN-11-17 |-45o|0.45 g/t |over 11.0m |54.5 |65.5 |\n|---------------------------------------------------------------|\n|incl |  |1.41 g/t |over 0.3m |57.0 |57.3 |\n|---------------------------------------------------------------|\n|  |  |  |  |  |  |\n|---------------------------------------------------------------|\n|MIN-11-18 |-45o|16.99 g/t |over 6.3m |75.4 |81.7 |\n|---------------------------------------------------------------|\n|incl |  |63.29 g/t |over 1.7m |77.5 |79.2 |\n|--------------------------...

More updates from Lion Rock Resources Inc