Business
First Energy Metals Metallurgical Head Sample Assays 1.46 Percent Lithium Oxide For Augustus Lithium Property Testwork
VANCOUVER, BC, April 4, 2022 /CNW/ - First Energy Metals Ltd. (CSE: FE) ("First Energy" or the "Company) is pleased to announce that it has received an update f

About this update from Linear Minerals Corp.
[{"type":"text","content":" VANCOUVER, BC, April 4, 2022 /CNW/ - First Energy Metals Ltd. (CSE: FE) (\"First Energy\" or the \"Company) is pleased to announce that it has received an update from SGS Canada Inc. in Lakefield, Ontario, Canada regarding progress and the next steps to be taken for the ongoing metallurgical testwork on the Augustus Lithium Property. The head sample being used for the testwork assayed 1.46 percent lithium oxide (Li2O). The following are the highlights of the metallurgical testwork steps: The head sample assayed 0.68% Li (or 1.46% Li2O), with < 0.01% total sulphur (S). An ICP multi-element scan and XRD on a head sample were still pending. Heavy liquid separation (HLS) testing showed favourable potential of using dense media separation (DMS) to produce >6% Li2O concentrates at specific gravity (SG) of 2.90 and above, at ~32% global lithium recovery, or 40% stage recovery. However, it was noted that the iron content in the spodumene concentrate was high, at 1.40% iron oxide (Fe2O3). Magnetic separation will be attempted to recover this iron. The laboratory is requested to proceed to DMS operations with a 1st pass stage at an SG of 2.65 to remove major silicate gangue minerals followed by a 2nd pass stage on the 1st pass floats at an SG of 2.90 to produce spodumene concentrate. The DMS concentrate will be split into 2 or 3 fractions to attempt to reject iron through magnetic separation and produce a final spodumene concentrate targeting >6% Li2O and < 1% Fe2O3 assays. The DMS middlings plus the DMS -0.5 mm fines will be combined for flotation testing and QEMSCAN analysis. The DMS operation if successful can result in lower operating costs for the project at the production stage. About Metallurgical Testwork The goal of the testwork is to develop a preliminary process to treat the spodumene bearing lithium mineralized rock to conceptualize a flowsheet, produce lithium oxide concentrate, and generate a high-purity lithium carbonate product. The Company has shipped to SGS Canada Inc. in Lakefield, Ontario, a 200-kilogram sample which includes a 50/50 mixture of drill core and surface samples with visible spodumene bearing lithium oxide mineralization. The testwork approach will be to first develop a beneficiation process on the composite sample with the goal of generating concentrate >6% Li2O at max...