Business

Fe Battery Metals Provides Corporate Update

VANCOUVER, BC, Sept. 1, 2023 /CNW/ - FE Battery Metals Ltd. (CSE: FE) (OTCQB: FEMFF) (WKN: A2JC89) ("FE Battery Metals" or the "Company) provides a corporate up

articleLinear Minerals Corp.September 1, 20234/company/linear-minerals-corp/news/fe-battery-metals-provides-corporate-update
Fe Battery Metals Provides Corporate Update

About this update from Linear Minerals Corp.

[{"type":"text","content":" VANCOUVER, BC, Sept. 1, 2023 /CNW/ - FE Battery Metals Ltd. (CSE: FE) (OTCQB: FEMFF) (WKN: A2JC89) (\"FE Battery Metals\" or the \"Company) provides a corporate update as described below. Despite a brief pause in field operations due to fire restrictions, FE has been engaged in a focused and successful exploration campaign at the Augustus Lithium Project located near Val d'Or Quebec. Work has included the discovery of new zones of lithium mineralization, a magnetic geophysical survey, diamond drilling, trenching, and positive metallurgical test work. Refer to Figure 1 for further details. UAV Geophysical Survey In 2023, FE Battery Metals conducted 277.2-line kilometres of highly detailed magnetic survey on the Property. The new drone-borne survey spanned over 5.5km east to west and served to extend our 2022 magnetic coverage of the Augustus project further to the south and southeast quadrants of the property. The survey revealed new structural anomalies that appear very similar to those observed within the main Augustus mineralized pegmatite zones. One such area, in the southeast quadrant, sits only 2.9kms from Quebec's largest lithium mine, the North American Lithium (\"NAL\") mine, operated by Sayona Mining and Piedmont Lithium. Follow up ground prospecting work at the area discovered highly prospective mineralization (Bella and Outcrop 900, see news release of August 15, 2023). 2023 Diamond Drilling In 2023, the Company continued to expand its two main showings, Augustus and Beluga, through further diamond drilling as well as prospecting of showings like Bella, Outcrop 900, and Keyboycon. During this year, the Company has, so far, completed 27 drill holes (LC23-42 to LC23-68) with a cumulative length of 5,124 m. Out of the 2023 drill holes, 12 holes intersected positive lithium mineralization while eight holes did not encounter significant lithium intercepts. Some of the new drill locations appear to connect the two main lithium zones and the geologic consensus indicates that lithium bearing mineralization all sits along a structural corridor of 5.5 kilometres with a potential to extend to over seven kilometers. Seven of the completed drill hole results are still pending. Trenching and Channel Sampling FE Battery Metals has continued its ground prospecting, geological mapping, trenching and channel sampling program. The...

More updates from Linear Minerals Corp.