Business
Leviathan Metals Intersects High-Grade Zinc, Lead and Silver mineralization in trenching at Fo?a, Bosnia and Herzegovina
Shallow trenching at the Vrela-Kremin trend returns 14 meters at 7.78% ZnEq within a broader inte...

About this update from Leviathan Metals Corp.
[{"type":"text","content":"Leviathan Metals Intersects High-Grade Zinc, Lead and Silver mineralization in trenching at Foča, Bosnia and Herzegovina\nShallow trenching at the Vrela-Kremin trend returns 14 meters at 7.78% ZnEq within a broader interval of 27 meters at 4.63% ZnEq (T25MAR04), and 12 meters at 8.92% ZnEq within a broader interval 29 meters at 4.67% ZnEq, (T25MAR11).Demonstrates high grade, silver, lead and zinc mineralization over prominent widths, within a broader geochemical and structural corridor striking over 2.6 kilometers. This work sets the stage for drilling at Foča during the 2026 exploration season. VANCOUVER, British Columbia, Jan. 22, 2026 (GLOBE NEWSWIRE) -- Leviathan Metals Corp. (“Leviathan”, the “Company”) (LVX – TSXV, LVXFF – OTC, 0GP – FSE) is pleased to announce the receipt of results from its 2025 mechanical trenching program at the Vrela-Kremin trend within the Marevo license area of the company’s Foča Project (“Foča”, the “Project”), Republika Srpska, Bosnia and Herzegovina. The best intervals from this program are presented in Table 1. Trenching was completed using a lightweight rubber-tracked excavator to an average bedrock depth of approximately 0.7 meters in the manner shown in Figure 4. A total of 1298 samples were collected from 2215 meters of such trenches. Table 1: Selected composite assay results from trenching at the Vrela-Kremin trend             Trench IDLength (m)Zn (%)Ag (ppm)Pb (%)ZnEq (%)1T24MAR012 6 5.66 16.90 1.22 6.43 T24VRE01 5 6.23 73.00 3.42 8.41 T25MAR04 27 4.18 16.30 0.70 4.63 Including 14 7.00 27.30 1.22 7.78 T25MAR11 29 4.19 19.90 0.75 4.67 Including 12 8.15 27.90 1.21 8.92 T25MAR32 16 1.61 29.50 0.87 2.21 Including 1 3.25 95.00 1.70 4.34 Including 2 7.08 103.50 3.76 9.47 Including 2 3.91 47.50 0.96 4.52 T25MAR34 7 2.52 10.50 0.25 2.68 Including 1 11.40 30.00 0.24 11.55
...