Technology

Leidos Helps Utilities and Developers Tackle AI Data Centers' Power Demands

As these hyperscale data centers, designed to support AI and large-scale computing, drive unprecedented energy loads, Leidos works to help modernize the grid and enhance reliable power delivery NORTHAMPTON, MA / ACCESS Newswire / January 28, 2026 ...

articleLeidos Holdings, Inc.January 28, 20266/company/leidos-holdings-inc/news/leidos-helps-utilities-developers-tackle-150500244
Leidos Helps Utilities and Developers Tackle AI Data Centers' Power Demands

About this update from Leidos Holdings, Inc.

[{"type":"text","content":"As these hyperscale data centers, designed to support AI and large-scale computing, drive unprecedented energy loads, Leidos works to help modernize the grid and enhance reliable power delivery","length":193,"tagName":"p"},{"type":"text","content":"NORTHAMPTON, MA / ACCESS Newswire / January 28, 2026 / Three Points to Remember","length":79,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"AI data centers are straining the power grid, and major system upgrades are needed to handle their significant and variable energy demands.","length":139,"tagName":"p"}]},{"val":[{"type":"text","content":"Leidos helps utilities and data center developers integrate energy systems using the existing grid combined with on-site power generation and energy storage.","length":157,"tagName":"p"}]},{"val":[{"type":"text","content":"Leidos is developing AI-powered tools for grid planning and power system optimization.","length":86,"tagName":"p"}]}],"tagName":"ol","bulletedList":false,"length":382},{"type":"text","content":"The nation's power grid needs modernization to meet rapidly growing energy demands from an AI-powered society. As more hyperscale data centers come online to serve AI computing needs, these massive installations could consume as much as 12% of all U.S. electricity within a few years, according to the Dept. of Energy's Berkeley Lab.","length":341,"tagName":"p"},{"type":"text","content":"AI data centers will further stress the aging infrastructure that carries, distributes and delivers electricity, which is already under strain from factors like electrification-driven load growth and weather-related heating and cooling demands.","length":244,"tagName":"p"},{"type":"text","content":""The power grid is an amazing thing but has been very slow, big and complicated to build, and we don't have enough people and time to get where we need to be," said Josh Wepman, VP and CTO of energy, infrastructure and automation at Leidos. "We need a radically more effective way of designing and scaling the future power grid."","length":353,"tagName":"p"},{"type":"text","content":"The power industry is grappling with a shortfall of engineers. Through AI-powered solutions, Leidos supports utilities and system owners across the country by automating much of the daily and labor-intensive tasks of power engi...

More updates from Leidos Holdings, Inc.

data centersLeidospower gridJosh Wepman